INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Above Ground Storage Tanks
2

Above Ground Storage Tanks

Above Ground Storage Tanks

(OP)
Dear Engineers,

What does it mean when the label of a crude fixed doom roof tank indicates a partial stress relief?

Is it related to the welding of the clean out door? and how does it usually applied?

Thanks

RE: Above Ground Storage Tanks

In the current standard, see Section 10.1.1(n) for the different markings to be used.
For an older tank, refer to the standard under which it was built.
But yes, this would usually be a flush manway, or flush shell nozzles, or shell nozzles/manways inserted and stress-relieved per 5.7.4.2 or 5.7.4.3, all of which are specified to be stress-relieved into a shell plate which is then welded into the tank.
For small tanks, it is sometimes feasible or desired to stress-relieve the whole tank, but this is uncommon.

RE: Above Ground Storage Tanks

(OP)
Well! that's very clear.

However, out of my curiosity, how is it possible to stress relief the bottom reinforcement plate of the clean out door when only replacing it?

Thank you very much.

RE: Above Ground Storage Tanks

API flush-typ cleanout assemblies are stress relieve (PWHT) prior to being installed into the tank.
The assembly includes the bottom reinforcing plate as well as a portion of shell plate.
See API 650 5.7.4.1:
5.7.4.1 All flush-type cleanout fittings and flush-type shell connections shall be thermally stress-relieved as an
assembly prior to installation in the tank shell or, alternatively, after installation into the tank shell if the entire tank is
stress-relieved. The stress relief shall be carried out within a temperature range of 600 °C to 650 °C (1100 °F to
1200 °F) (see 5.7.4.5 for quenched and tempered materials) for 1 hour per 25 mm (1 in.) of shell thickness. The
assembly shall include the bottom reinforcing plate (or annular plate) and the flange-to-neck weld.

RE: Above Ground Storage Tanks

(OP)
Well! As in our case, we are going to only replace the bottom reinforcement plate (or annular plate) of the cleaning door.

Does we have to stress-relief the whole clean-out door assembly afterwards? or just PWHT of the new welding of the new annular plates to the new door reinforcement plate?

Or, in this case, is not required.

Thanks.

RE: Above Ground Storage Tanks

In my opinion (and I tend to be conservative), replacing the thickened plate attached to the cleanout is probelmatic and will need PWHT, possibly by removing the whole assembly including the partial shell plate. In lieu of that, you might be able to use controlled deposition welding and more extensive NDE. An experienced tank engineer would be able to help you. Some of the decision involves the risk and consequence of a failure (leak). Do you actually need to remove and repolace the thickened plate or only the bottom plate lapped onto it?

RE: Above Ground Storage Tanks

(OP)
Morning

Thank you for your swift reply.

Actually, the thickened plate has a metal loss of about 34%, while the butt welded annular plates with it has around 64% reduction on both sides.

All corrosion attacked these plates in the 40 cm area near the bottom lap-welded plates.

As long as we are replacing all the Tank floor, we guess that it is better to replace the door clean out reinforced bottom plate, as well.

Do you agree about that?

Best wishes,

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close