INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Generator Remote Sync Fault

Generator Remote Sync Fault

Generator Remote Sync Fault

(OP)
This alarm:"Another Sync Channel Has Been Selected" continuously pops up on CitectSCADA 2015 and cannot remote sync from CitectSCADA. There is a ABB Synchrotact 5 that controls the synchronization of the generator.CitectSCADA 2015 reads off from Ge PLC register (%R00007)and the comments says;"Sync panel 1 selection feedback-DI Register.What inputs/outputs of the ABB Synchrotact 5 would generate this alarm on CitectSCADA 2015?Thank you

RE: Generator Remote Sync Fault

This is why generators should not be operated in parellel.

RE: Generator Remote Sync Fault

You're a funny guy, MBrooke.

OP: Have you inquired with the supplier / manufacturer / consultant? Is this a new problem?

CR

"As iron sharpens iron, so one person sharpens another." [Proverbs 27:17, NIV]

RE: Generator Remote Sync Fault

If generators were not operated in parallel Texas would not be the only place sitting in the cold and dark.

Bill
--------------------
Ohm's law
Not just a good idea;
It's the LAW!

RE: Generator Remote Sync Fault

On a grid level paralleling has its benefits, but if this is a stand alone or back-up system I would look at keeping things simple unless paralleling was absolutely required.

Perhaps I'm just a bit jaded.

But anyways, as others have said, have you contacted the manufacturer?

RE: Generator Remote Sync Fault

There's so many possibilities between the SCADA platform and the sync relay that its impossible to provide useful suggestions based on the information provided.
Are there any manuals provided with the system that may provide guidance?
Failing that, have you asked the Systems Integrator that provided the system if possible?

EDMS Australia

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close