ABAQUS - Bolt Pre-Load
ABAQUS - Bolt Pre-Load
(OP)
Do I always have to set constraints to the subsequent steps after I pre-load a Bolt in ABAQUS? I know that the constraints are set so its new length is fixed, but do I necessarily have to set the constraints?