INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Deburring responsibilities - raw casting and finish machined casting

Deburring responsibilities - raw casting and finish machined casting

Deburring responsibilities - raw casting and finish machined casting

(OP)
Our all purpose drawing (no separate casting drawing ) from the 1930s has been revised 14 times over the years.
Regrettably it bears no " break all sharp edges" note.
I think it is still fair to expect, and require, the machine shop to de-burr any sharp edges they create.

The foundry "cleans up" a couple of cast in slots, and in the process creates some raggedy edges that will not be shared with finished diameters or faces.

When we get the finish parts back, the sharp edged slots in the casting are still sharp edged. Refer to attached image.

I think we will be revising the drawing and perhaps even the RFQ and PO to include a deburring note. Maybe "machine shop to deburr all sharp edges except as noted."

But in the mean time, are there "understood" industry responsibilities or best practices for who deburrs what and when?

thanks,

Dan T

RE: Deburring responsibilities - raw casting and finish machined casting

I'd argue that if it's not on the drawing (or not in contract conditions or whatever) it's not owed. The deburring is a separate operation, either with another tool in the machine, or by hand after machining- if you want/need it, you have to ask for it.

RE: Deburring responsibilities - raw casting and finish machined casting

I agree with SwinnyGG, you must specify on the drawing. Deburring can be a costly procedure. The only situation I can think of where the manufacturer would deburr the part without being asked is if they are a small shop trying to attract business, or where not deburring the part creates a safety hazard. For a handful of parts part, the operator working on the part *may* decide to deburr it themselves, just out of habit, but if you have at least a dozen parts, forget about it.

If it isn't on the drawing, and they come back with burrs, you are stuck with it.

RE: Deburring responsibilities - raw casting and finish machined casting

Agree with above. In any delivery of mechanical parts you will get what you have specified. Revise the drawins and specifications!

Another thought if the parts have been supplied from the same source, in or outside your own works since the thirties, and with only minor chanes. Perhaps time to revise totally in cooperation with old a newer suppliers both on construction and price in competition?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close