INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Sub-basin modeling question

Sub-basin modeling question

Sub-basin modeling question

(OP)
I apologize for any confusion this post may cause as a result of the questions that I am asking or due to the information that I am presenting, but nonetheless, I appreciate any guidance that can be offered.

Two existing drainage basins combine storm water runoff with the hydrologic properties below:

Basin A - Existing
1. 54 acres
2. 70-minute Tc
3. 87.0 CN value

Basing B - Existing
1. 164 acres
2. 110-minhute TC
3. 92.1 CN value

Combined 100-Year storm water runoff Q - 760 CFS.

A proposed residential development (Basin C) will be located within Basin (B). Storm water runoff from Basin A, Basin B and Basin C will combine at the existing discharge point. The post-development hydrologic properties are below:

Basin A - Proposed
1. 30 acres
2. 37 minutes Tc
3. 91.1 CN value

Basin B - Proposed
1. 156 acres
2. 75 minutes Tc (different path than existing; the existing path is now one of the shorter duration pathways in the basin due to the development)
3. 86.6 CN value

Basin C - Proposed
1. 75 acres
2. 53 minutes Tc
3. 92.3 CN value

Combined 100-year storm water runoff Q (undetained from the development)for Basin A, Basin B and Basin C - 1,225 CFS
Combined storm water runoff Q (100-year)for Basin A and Basin B - 830 CFS

How are scenarios such as the above usually handled? The combined storm water flowrate from Basin A and Basin B for the post-development conditions (830 CFS) is greater than the combined storm water flowrate from Basin A and Basin B for the pre-development conditions (760 CFS), essentially removing any ability for the proposed residential subdivision discharging storm water runoff. Would either the Tc and/or CN value for Basin A be left those for the pre-existing conditions?

RE: Sub-basin modeling question

If your goal is to mitigate the developed peak flow, this is commonly accomplished with a detention pond.

Peter Smart
HydroCAD Software
www.hydrocad.net

RE: Sub-basin modeling question

What he said!

RE: Sub-basin modeling question

(OP)
Understood, and that is what the intent is. The question that I have is specific to the existing drainage basins in the post-development condition. In this case, Basin A and Basin B will be reduced in area due to the proposed residential development. The development's location within the basins remove the grassland and thus increase the CN values for Basin A and Basin B. Additionally, the time of concentration (Tc) paths are adjusted since the existing paths are no the longest-duration pathways in the post-development condition; there are different pathways longer in duration, but not as long as the original Tc values. Thus, the existing basins, in the post-development condition, are smaller in area and Tc durations with higher CN values.

When I enter these values into the model for the post-development condition for Basin A and Basin B, the combined storm water runoff flow rates are greater than the flow rates for the pre-development condition, before adding the proposed residential development into the model as its own basin (Basin C). I need to calculate the allowable discharge from Basin C to meet the pre-development flow rates, but if the flow rates for Basin A and Basin B are greater in the post-development condition (830 CFS for 100-year storm) than the pre-development condition (760 CFS for the 100-year storm), there won't be any allowable discharge from Basin C. What would be a good recommendation in this case? Would I adjust the Tc or CN values back to the original values for the post-development conditions?

Thank you very much.

RE: Sub-basin modeling question

You'll have to run the entire watershed (A+B+C) through the detention pond.

Peter Smart
HydroCAD Software
www.hydrocad.net

RE: Sub-basin modeling question

(OP)
So the detention pond would be a regional detention pond?

RE: Sub-basin modeling question

Whatever you call it, if you're increasing the flow from basins A and B you will presumably have to treat that flow.

Peter Smart
HydroCAD Software
www.hydrocad.net

RE: Sub-basin modeling question

total area increased and basin c got smaller? should probably check your numbers

RE: Sub-basin modeling question

First, look at ways to reduce the CN for A+B in your watershed. if not possible, with your total post-development increases (+ 43 acres), you need to look at providing some detention in A+B. You may need to provide series of detentions to reduce flow down to pre-development condition.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close