Rubber Mold - Pneumatic Ejectors
Rubber Mold - Pneumatic Ejectors
(OP)
For a rubber curing press, I want to test removing the product without the use of pneumatic ejectors. Currently there is a 90 psi supply controlled by electronic solenoid valves, automatically activated. If I shut of the air supply to the ejectors, will there be any negative effects to the solenoids?
RE: Rubber Mold - Pneumatic Ejectors
RE: Rubber Mold - Pneumatic Ejectors
= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, consulting work welcomed
RE: Rubber Mold - Pneumatic Ejectors