INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

API-653, technical reason for maximum size of welded on patch plate in critical zone?
4

API-653, technical reason for maximum size of welded on patch plate in critical zone?

API-653, technical reason for maximum size of welded on patch plate in critical zone?

(OP)
thread1452-419159: API 653 Max Patch Size in Critical Zone

Hi,

I'm a quality assurance engineer at a manufacturing facility. My organization has acquired a neighboring chemical plant and I've been consulted about undertaking some possible repair work in a water tank installed there.
The historical reports of this equipment indicate that there has been some nonstandard repair work undertaken on its bottom plate in the recent past.
The details of this work are: an 84 inch long and 12 inch wide welded on patch plate was installed on top of a smaller insert plate within the critical zone.
API-653, Figure 9.13, dictates that the maximum length of the welded on patch plate should not exceed 24 inches along the shell. This nonstandard repair is in clear violation of the code; however, my question is: 'What would the consequence be, if I were to adopt this repair as a permanent one?' It has already been in service for the past 3 years, without the surfacing of any indication.
Is there any specific technical justification to API-653's limitation on the maximum size of welded on patch plate in the critical zone?

Regards,
J.H

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

Quote (Johns Hopkins (Mechanical))


.........an 84 inch long and 12 inch wide welded on patch plate was installed on top of a smaller insert plate within the critical zone.
API-653, Figure 9.13, dictates that the maximum length of the welded on patch plate should not exceed 24 inches along the shell. This nonstandard repair is in clear violation of the code; however, my question is: 'What would the consequence be, if I were to adopt this repair as a permanent one?'.........


Welded-on Patch Plates on Tank Bottom Plates are depicted on Figure 9-5 (API 653 2003 ) and see note 3. The maximum dimension along the shell for welded-on patch plates in the critical zone is 24 inches.

For the other places, allmost there is no size and shape restriction.

What is the type of foundation? (RC ring,Granular ring, RC pad..?) is there any risk for edge settlement?

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

I think JStephen's answer in the thread you linked may be the closest you'll get to a "technical justification".

I've always been reluctant to use "It has already been in service for the past 3 years ..." as a justification. I would suspect that a tank has not experienced it's full range of design criteria in such a short time frame. Things like the tank completely full in the winter with the weather at the Design Metal Temp, as well as whatever else this tank was designed for.

At some point it may be a judgement call by an experienced tank engineer. HTURKAK has some good questions. I would also wonder what size tank you're talking about (bigger tanks will have more stress in this area).

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

(OP)
@HTURKAK and @Geoff13:

The type of foundation is RC ring and following are the remaining specifics of the tank:
Tank Diameter: 9330 mm
Tank Height: 7320 mm
Nominal Capacity: 500 m3
Service: De-ionized Water

The foundation is pretty solid, doesn't exhibit any nonuniform settling or irregular clearance of the projection plate. Furthermore, the previous internal inspection reports do not mention any anomaly in the dishing or bulging profile of the tank bottom.

Regards

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

Quote (Johns Hopkins (Mechanical)()


.........the details of this work are: an 84 inch long and 12 inch wide welded on patch plate was installed on top of a smaller insert plate within the critical zone...Tank Diameter: 9330 mm,Tank Height: 7320 mm....


The patch plates shall have a circular circumference at junction with shell. Will you post the details of patch ( and position, shape, welding to base and shell?

The minimum width of annular plate defined in API 650 La= 390 tb/((HG)**0.5). The theory behind this ,the thickness of the annular plate is a function of the stress and thickness of the first shell course ,and the width of the annular plate shall be adequate to support the weight of liquid content on top of it in the case of a foundation settlement with F.S.=2.0 . Another reason ,full plastic moment shall develop by yielding of the plate beneath the shell, that is, the annular plate shall not be stronger than first shell course.

Regarding the repair restriction 24 in ,in case of foundation settlement or distortion, the critical zone (so the patch) will experience high bending stresses which could tear apart the shell-to-bottom fillet welds.



RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

Its a good question posted.

I have experienced too non-standard repairs owing to knowledge of the inspector and management present at that plant.
For instance:
- Patches with Corners not rounded.

Though the repairs were rectified after inspection by removing the plate and reinstalling as per API-653. But the history of original goof-up is not known. So it survived atleast 3years.
The committee regarding API-653 may shed a light into it. You may ask for elaboration for 24 inch bar and subsequently enlighten us as well.
But if possible, first thing would be to rectify this anomaly with replacement unless an engineering assessment is done.
Hope it may help to further move on this query.

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

Dear Johns Hopkins,

With due regards to all the replies above, do carry out MFL of the tank bottom before taking any decision about the tank. There could be severe underside corrosion, corrosion under coating etc. that could be detrimental. The last thing we want is a leak from the bottom plates.

Also, if the bottom plate and the shell are bare, think of some epoxy based coating that would increase the life of the water tank by years.

Regards.

DHURJATI SEN
Kolkata, India

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

(OP)
@ Dhurjati Sen,

Records indicate that MFL was performed on the tank twice in the past. It was only on the basis of MFL that underside corrosion was detected and consequently addressed through this much needed, albeit nonstandard, repair.

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

(OP)
@ HTURKAK



Following are the dimensions:

24 x 12" (welded on patch plate, on the left most part, installed in 2017)
29 x 13" (insert plate with nonstandard corners, in the middle, installed in 2014)
84 x 12" (welded on patch plate, on the right, installed in 2017 on top of the insert plate of 2014)

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

(OP)
@ HTURKAK,

Regarding the foundation distortion or settlement, this equipment is not at risk of that happening. Any other reason why API-653's limitation might hold water in this case?

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

@ Johns Hopkins (Mechanical),

As per your explanation; magnetic flux leakage was performed twice in the past ; the tank is in service for the past 3 years and ; there is no risk of foundation settlement and distortion.

If the tank is not located at high seismic zone (in case of uplift the weldment may experience high bending stresses if the tank is not anchored) and the weldment (at shell-to-patch fillet weld ) free of cracks , personally i will agree with the repair.

RE: API-653, technical reason for maximum size of welded on patch plate in critical zone?

The tank is small, and the product (water) isn't dangerous. I'd leave the 84" patch alone.

However, you said the MFL revealed underside corrosion, so slapping these patches on top doesn't fix your problem. They're only bandages for the symptom. It's such a tiny tank that next time I would take the full bottom out, replace the fill with a non-reactive one and install a new bottom.

Good luck.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

eBook - Integrating the Engineering Ecosystem
Aras Innovator provides multiple options for integrating data between systems, depending on the scenario. Utilizing the right approach to meet specific business requirements is vital. These needs range from authoring tools, federating data from various and dissimilar databases, and triggering processes and workflows. Download Now
Research Report - Simulation-Driven Design for SOLIDWORKS Users
In this engineering.com research report, we discuss the rising role of simulation and the paradigm shift commonly called the democratization of simulation. In particular, we focus on how SOLIDWORKS users can take advantage of simulation-driven design through two analysis tools: SOLIDWORKS Simulation and 3DEXPERIENCE WORKS. Download Now
White Paper - Industry 4.0 and the Future of Engineering Education
With industries becoming more automated, more tech-driven and more complex, engineers need to keep their skills and knowledge up to date in order to stay on top of this wave—and to be prepared for the Industry 4.0 future. The University of Cincinnati offers two online Master of Engineering degree programs designed specifically for practicing engineers. Download Now
eBook - The Design Gridlock Manifesto
In this eBook, you’ll learn 6 ways old CAD technology slows your company down and hear how design teams have put those problems to rest. “The Design Gridlock Manifesto” shares first-hand modern CAD experiences from 15 companies around the world. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close