Live tap of water main on an extremely busy street
Live tap of water main on an extremely busy street
(OP)
The City is going to perform a live 8" x 8" tapping sleeve and valve next month on a very busy street. I am concerned about the safety of the City Employees working on a live tap. Could someone please help me with any suggestions on safety aspect that will need to be considered or taken? I want to make sure we as general contractor take all necessary precautions. Please help.
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
Something like this https://www.contractorsunlimited.co.uk/toolbox/haz...
You face some clear risks here being traffic collision and impact, water filling the excavation as well as the usual handling issues and excavation collapse / supports / means of escape, asphyxiation etc.
If this is a live main then there is a risk of major water flow if it all goes horribly wrong.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: Live tap of water main on an extremely busy street
As a young construction professional, you could be challenged in many ways. Be prepared, know the job, listen before talk, and ask instead of questioning, if you see something done the other way. Familiar with OSHA regulation and construction practice are very important for success. I wish you have a good start.
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
Unless there is direct involvement of city engineer(s)/technical personnel, you maybe duty bound to represent the city. Check it out.
RE: Live tap of water main on an extremely busy street
TTFN (ta ta for now)
I can do absolutely anything. I'm an expert! https://www.youtube.com/watch?v=BKorP55Aqvg
FAQ731-376: Eng-Tips.com Forum Policies forum1529: Translation Assistance for Engineers Entire Forum list http://www.eng-tips.com/forumlist.cfm
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
This implies the cutter is taking away 50% of the existing pipe.
An 8" x 6" I thought was the biggest you can do.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
Source T. D. Williamson Inc, TDW Tapping Fittings catalog.
You could verify fitting was designed for the installation arrangement and has an appropriate pressure rating. Reviewing the OEM guidance is worthwhile.
This job clearly needs a job safety plan, as indicated above, but except for the size on size tapping sleeve seems routine for a skilled crew. The biggest risk is that the skilled crew will sometimes take unwise shortcuts because it worked before.
If you have the opportunity to take the OSHA outreach classes (or similar), you will have the opportunity to see a bunch of eyeopening workplace safety failures. https://www.osha.com/courses/outreach.html
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street
Agree. Always envy people excel in multi fields, especially engineering.
RE: Live tap of water main on an extremely busy street
RE: Live tap of water main on an extremely busy street