×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

"Tee" section straightness and sweep completely set forth in ASTM A6

"Tee" section straightness and sweep completely set forth in ASTM A6

"Tee" section straightness and sweep completely set forth in ASTM A6

(OP)
Construction and fabrication tolerances for straightness ( Camber and sweep )of components made from standard steel sections often refer back to "Mill tolerances".

Today I am working on 18 plus internal drawings created between 1946 and 1995 that have notes that require our inspection department to confirm the steel "stock must be within rolling Mill tolerances set by the American steel industry." And of course I am working on these because a customer just rejected and returned an entire lot of parts made by a long time suppler because they are "bent."

Some reference documents, even from the most honorable and steadfast AISC, make seemingly iron clad statements like "Mill dimensional tolerances are completely set forth in ASTM A6/A6M. "

However a quick check of ASTM A6 took me to Table 21 "Permitted Variations in Straightness for S, M, C, MC, L, T, Z, and Bulb Angle Shapes."

"Oh boy!", I thought. We've got them now Robin/Watson/Tonto.

Then the legend for table 21 had this to say about "sweep" (sideways or Axis 2-2 bending).
"Due to the extreme variations in flexibility of these shapes, permitted variations for sweep are subject to negotiations between the manufacturer and the purchaser for the individual sections involved."

I guess I can see how our Design graphics group would perpetuate a note that has "worked" for decades.
I am about to replace the existing note with one that limits the "sweep" to the same value as the "camber" .

Does anyone see something I am overlooking ?

thanks,

Dan T

RE: "Tee" section straightness and sweep completely set forth in ASTM A6

I don't know about the CS side but for SS there are a couple of fitting specs that have their own tol notes.
The same may be true for steel, be sure to check other fitting specs.
Heck you might find something that you can use.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy

RE: "Tee" section straightness and sweep completely set forth in ASTM A6

I don't think you're missing anything, but I'd take a look and see if those parts conform to Table 24. I know it's for W and HP, but a handful of steel suppliers apply that as a basic rule to channels and other I shapes. T shapes are cut from the associated I shape (WT, MT, ST) so the sweep spec should match that - camber is sometimes a problem as the residual stress release can make them curl when the web is cut. And for angles - I could be thinking about this wrong but isn't sweep just camber on its side? It seems having both would be redundant.

Thanks for pointing this out - I hadn't realized that was in there.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now
The Great Project Profitability Debate
A/E firms have a great opportunity to lead the world into the future, but the industry’s greatest asset—real-time data—is sitting wasted in clunky, archaic ERP platforms. Learn how real-time, fully interactive dashboards in a modern ERP allow you to unlock data that will shape the future of the world. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close