INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Encountered loose soil

Encountered loose soil

Encountered loose soil

(OP)
Hi,

I am new to this forum. I can see this forum is full of people with great knowledge and experiences, so trying my luck here to find answer.
I am handling a school project now. We had encountered loose soil. First reason is the architect decided to relocate the building. The farthest area is a nearby creek. On that point we have no geotech investigations. The structural specified a depth of 3m only. Upon excavation at that area the soil was very loose compared to the other side of the excavation. Note we are on a mat foundation if this is something that could help out.

Any solution besides going deeper? If were going deeper we will end up just putting a basement to be utilized so as not to waste the amount/cost of excavation.

attached is a photo on both sides.


RE: Encountered loose soil

First step would be getting a local geotechnical engineer involved. You need to find out what the subsoils are like under the new building location.

Depending on the building footprint size and available contractors you’re probably looking at ground improvement, stiffening the mat, or switching from a mat to a deep foundation.

RE: Encountered loose soil

Agree about a geotech. In looking at the photos, to have the ground cut stand vertically, is a positive sign.

RE: Encountered loose soil

(OP)
We already opted for a ground improvement. Unfortunately they refused to do the work. Probably is because most areas are already excavated to the depth of the 3meters and they would just improve the remaining depth about 1.5-2m.

My bad forgot to tell about the ground improvement.

If deep foundation? is this still a mat footing or isolated one? Incase we are actually leaning towards a basement should we need to go deeper.

We are looking also for the possibility of mass concrete to replace the loose soil? Any thoughts about this? Since we won’t be needing to use other equipments.

RE: Encountered loose soil

Your only answer is to get an experienced local geotechnical engineer. You dont even know the ground conditions at your building location other than its loose.

There are likely much better options that mass filling. Again, a geotech is best placed to advise.

RE: Encountered loose soil

I agree you need a geotech involved. A few observations though...

It appears you have sheet piles installed in your photo. That means you likely have access to a vibratory hammer. One quick and easy ground improvement method you can use in loose sands (another thing we don't know from your description...you said "loose" so I'll assume sands) is to create densified sand columns using a 24 to 30 inch diameter open end steel pipe inserted and extracted with the vibratory hammer. Create a grid that is 2x the pipe diameter. Insert at cross points in the grid. Extend to the depth of improvement needed. You'll see the soil densify within the pipe and after extraction you will see the soil column lower than the adjacent soil. You might need to add water within the pipe as you densify.

Will work well with mat foundation. Verify this with a local geotech. I've used it successfully in the past; however, you need to know the soil conditions first.

RE: Encountered loose soil

(OP)
For our soil investigations results.

below are the depth when spt reached n values >50 hence they started coring.
BH-1 4.5-6.0
BH-2 1.5-3.0/3.0-4.5
BH-3 4.5-6.0
BH-4 3.25-4.5

above this depths the soil description are clayey sand, sandy lean clay, silty sand with gravel.

this is the two additional boreholes at the farthest location near the creek. Depths when spt reached n values >50. Note we just opted to test this area now due to relocation of the bldg.
Bh-5 6.0 (nearest on the creek)
BH-6 4.5

Does the Strl seems to missed this details when he specified the 3meter depth he required? even with the old test assuming we haven’t done our two additional test.

we are still trying to look for a geotech right now.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - How ESI is Helping Move New Medical Device Product to Market Quicker & More Cost Effic
Early Supplier Involvement has long been a strategy employed by manufacturers to produce innovative products. Now, it almost seems like a necessity. Because decisions made in the design phase can positively affect product quality and costs, this can help add value to OEM bottom lines. This white paper will discuss many facets of ESI, including why it’s so valuable today, what challenges limit the benefits of ESI, how cost is impacted, and more. Download Now
White Paper - Moving to a Driverless Future
This white paper describes what we see as the best practices to support a sustainable engineering process for autonomous vehicle design. It exposes how to use simulation and testing in common frameworks to enable design exploration, verification and validation for the development of autonomous cars at a system, software and full-vehicle level to drive a mature product development process for automated driving. Download Now
Research Report - How Engineers are Using Remote Access
Remote access enables engineers to work from anywhere provided they have an internet connection. We surveyed our audience of engineers, designers and product managers to learn how they use remote access within their organizations. We wanted to know which industries have adopted remote access, which software they are using, and what features matter most. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close