INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Pump Monorail/Hoist Rigging - Headroom over pumps

Pump Monorail/Hoist Rigging - Headroom over pumps

Pump Monorail/Hoist Rigging - Headroom over pumps

(OP)
I am looking for geometric vertical headroom clearance rules of thumb for rigging pumps into/out of a space via a monorail equipped with an electric hoist and trolley.

More specifically, how much room is necessary between the top of the equipment to be rigged over and the bottom of the hook at it’s highest point? In addition, how much extra room is typically included as a safety factor.

Also interested in learning of any pitfalls that may be encountered/avoided.

Thank you in advance for your input/feedback!

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

Depends on your rigging scheme !!

Are you using a lifting beam ? One or two slings ???

I would assume a minimum distance of 4 to 5 feet would be about right

MJCronin
Sr. Process Engineer

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

hondashadow1100vt,
(1) I strongly suggest you start with a simple sketch of what you think you will have and need.
(2) Next I suggest you go out to the site/building and Identify all the fixed objects (under the crane rail)
(3) Next identify the dimensions of the Pump (and other objects) you will need to remove
(4) Next get the dimensions of the the objects you will need to lift and travel over
(5) After you have all the data, then update your sketch.
(6) Finally, get a very smart co-worker to check you plan.

Sometimes its possible to do all the right things and still get bad results

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

pennpiper: will need to be a LOT smarter than the OP.

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

monorail Hoist for these pumps are at height much above these pump usually that height can vary from 10m to 20m.

it depends upon the height of the pump flange you need to lift up.
Suppose the height is 10m , so actual height can be 10m - heigght of flange(say, 2.5m) = 7.5m effective height.

A well phrased question has answers in itself!!!

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

(OP)
MJ Cronin:
- I had not planned on using a lifting beam but I am open minded to considering it.
- I had figured on using a couple of slings but open minded to alternative arrangements.
- The pumps are 200-HP horizontal split case types. The pump itself is about 4'-0" +/- in height when assembled (seems like I'd need more than just 5'-0" feet for a 4'-0" tall pump. I am just not sure how much additional height to add).

Thanks for the input/feedback. Much appreciated.

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

(OP)
pennpiper:

Thanks for the good practical advice. I'll plan to do just that. (BTW: It is greenfield construction as opposed to an existing facility so it should cut down on the steps just a little).

Thank you for the suggestions.

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

(OP)
Artisi:
Does "OP" mean other people? Not sure I follow how to interpret the comment (or maybe I am not supposed to follow since the comment isn't really directed at me). If so, I'll just keep my nose out of it unless you let me know otherwise. Thanks for the reply. I do appreciate it.

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

(OP)
shashankTurbomachine:

I have about 6.5-FT (~2 m) from the top of an installed pump casing to the bottom of the hook. The pump casing (top to base plate) appears to be about 4-FT (1.2 m).
(Note: Hook to floor elevation is about 14-FT as the pumps are up on pedestals although this seems immaterial at the moment).

Thank you for the feedback.

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

For larger loads that I wouldn't lift with a single sling I like a spreader beam.
You can position the hooks so that the load is well balanced.

We always liked at least 2' clear.
Your situation sounds a little tight to me.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

effectively you have only 0.8 m from the base of the hook. but you can't even hang the casing to its double height with that headroom. Please increase the bottom of the hook from casing length to 4m from 2m. so that you can easily lift the 1.2m casing atleast 2 times (4-1.2=2.8) leaving extra space for working

A well phrased question has answers in itself!!!

RE: Pump Monorail/Hoist Rigging - Headroom over pumps

(OP)
Thanks all!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now