INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

API 650 Storage Tank Fabrication Sequence
2

API 650 Storage Tank Fabrication Sequence

API 650 Storage Tank Fabrication Sequence

(OP)
Hello

I would like to ask about storage tank fabrication sequence, I do not find anything regarding to this in API 650. A fabricator plans to do blasting + primer on all plates prior to rolling, then transport them plates to site and finish all the welding + final coat. Is this a good practice?

Personally I foresee a lot of touch up needs to be done at site since the primer may be damaged by the rolling machine. On top of that, the surface profile generated from blasting may be ruined by the rolling machine as well.

Should we proceed with the sequence (blast+prime -> roll -> final coat), is there any code that specifies acceptance criteria of the surface profile and primer? I think not all damaged profile has to be repaired.

RE: API 650 Storage Tank Fabrication Sequence

2
Here's what I've seen: blast both sides (keeps distortion from blasting to a minimum), apply weldable primer to the outside, apply intermediate coat to the outside but not within 3" of the edges, bevel and roll the plates, stack and deliver them. Plan to weld, then blast and intermediate coat the seams, water clean it all, put the final coat on the whole tank shell. In many jurisdictions, the tank must be white to be put in service and a white intermediate coat even if scratched is sufficient. Assuming the intermediate coat has a decent re-coat time (I've seen 12 months) then the water clean and the final coat is not a time critical task to put the tank in service.

RE: API 650 Storage Tank Fabrication Sequence

Dear sollapalooza,

Your contractor is adhering to a widely practiced sequence.

Quote (On top of that, the surface profile generated from blasting may be ruined by the rolling machine as well.)


Once you carry out primer, you do not require surface profile.

Yes, touch up needs to be carried out, but Inorganice Zinc Silicate primer is quite tough.

Regards.

DHURJATI SEN
Kolkata, India

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now