INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Downhill Pumping

Downhill Pumping

Downhill Pumping

(OP)
Hello,

I am designing a sanitary sewer force main which involves pumping below a creek and the outfall elevation is lower than the pump station. This will be an interim condition as a new WWTP is being designed and the force main will be rerouted in 5-10 years.I have not come across this issue before but have researched downhill pumping on this forum and through various online sources and believe the best route will be to keep the line full to avoid issues with constantly filling and emptying the line. I have researched back-pressure sustaining valves as well as an actuated plug valves and I would prefer to go with the former to minimize the system complexity but understand this will require more energy since the pumps will be forced to pump against the head loss across the valve.

I am writing to gain feedback from folks who may have designed or analysed a system like this. Specifically, I am looking for help to analyse the back pressure sustaining valve and determining the corresponding TDH. I have attached a spreadsheet with the project information as well as profiles for the various conditions.

I understand this topic had been discussed at length and any tips or recommendations would be greatly appreciated.

Sincerely

Challenger_84



RE: Downhill Pumping

Well it depends on how much you want to spend and how much services are available at the far end.

A simple fixed back pressure valve would add about 20m head to maintain a full pipe at all flows from zero upwards.

A more complex variable control valve varying the back pressure depending on flow rate would reduce this to probably 4-5m, but needs a controller, flow measurement from somewhere.

How much this is worth to you depends on how often you are flowing and what the energy costs are, but 5-10 years is a long time.

Or it could work with a simple pump on/ pump off signal with an actuated valve to open / close.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close