INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Chiller/mechanical pad on top of existing slope

Chiller/mechanical pad on top of existing slope

Chiller/mechanical pad on top of existing slope

(OP)
We are having to add a new chiller/mechanical pad on top of an existing slope at a dam project. I have attached a rough sketch for reference. The pad size and loading conditions are not known at this point; and I know this will influence the foundation type. The existing slope consists of compacted earth fill, clayey sand [SC] with an effective friction angle around 33 degrees. Groundwater will not be an issue. The slope has been stable for 40+ years.

We were originally thinking to just constructing a reinforced earth wall (mse/segmental retaining wall) and ground supporting the slab; however, I think we may have issues with having to shore the soils adjacent to the existing parking and sidewalk area if the reinforcement extends far enough. We will also have to check slope stability for this case.

My second thought is to just install helical piles through the slope and support the mechanical equipment on a platform. I feel this would be quick and easy.

Which of these options do you think would be most cost effective?

RE: Chiller/mechanical pad on top of existing slope

I'd be reluctant to add any load to the slope even if the numbers come out. Water table may change with a lot of wet weather; who knows.

RE: Chiller/mechanical pad on top of existing slope

good luck getting a permit to drill and install piles in a dam.

RE: Chiller/mechanical pad on top of existing slope

Can you drive piles or use drilled shafts to support a platform for the mechanical equipment? If so, maybe you could then attach then attach closure panels around the three sides for aesthetic reasons. Building a pile or pier supported platform would eliminate adding load to the slope and could eliminate the need for sheeting to support the paving when gouging into the slope.

www.PeirceEngineering.com

RE: Chiller/mechanical pad on top of existing slope

(OP)
cvg, you have a good point

RE: Chiller/mechanical pad on top of existing slope

Maybe the piles could be sheet piles. Many dams have sheet piles as their cut-off walls.

www.PeirceEngineering.com

RE: Chiller/mechanical pad on top of existing slope

How about H piles?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - PLM and ERP: Their Respective Roles in Modern Manufacturing
Leading manufacturers are aligning their people, processes, and tools from initial product ideation through to field service. They do so by providing access to product and enterprise data in the context of each person’s domain expertise. However, it can be complicated and costly to unite engineering with the factory and supply chain. Download Now
White Paper - Medical Device Design Control
Medical device product development is a highly integrated and regulated process. Implementation of a requirements tracking solution requires attention to a variety of nuanced topics. When presented with the task of tracking the many concept relationships in a project of this type, the initial software solution of choice tends to be a two-dimensional text systems. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close