INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Whats the best type for temp. shoring

Whats the best type for temp. shoring

Whats the best type for temp. shoring

(OP)
Hi,

I have a 13 ft by 14 ft steel frame platform supported by steel columns at each corner of the platform.
There is one corner column W 8 x 24 needs to be removed and temporary shore that corner.
The platform is inside a Pre Eng building.
Whats the best type of shoring that corner of the platform for duration of 2 weeks?

What are reputable and good brands shoring manufacturers and products (In US)?
The loads on the existing column is : 1.28 Kips (DL) + 4 Kips (LL) = Total 6 Kips
Existing Steel column to be temp. removed is 14 ft tall.

I appreciate for your comments and directions.

Regards,
Skj

RE: Whats the best type for temp. shoring

What would the shoring sit on? Slab on grade? Suspended slab? Another steel frame? We would need significantly more info to be practical.

RE: Whats the best type for temp. shoring

For a service load of 6 kips steel post shores will work - however you need to check their capacity over your 14' height. And check how the shoring bases will be founded/supported, as jayrod12 suggested.

However, my preference is usually to use an aluminum shoring tower - if existing adjacent structures permit - with alum stringers/beams linking the u-heads of the braced-tower shoring legs. The braced frames are linked with cross-braces and are inherently stable.

The problem with single-leg post shores is that they usually need to be braced back to adjacent elements.

By way of brands, SAFWAY, PERI, DOKA, ALUMA, EFCO, etc., etc. all make very good shoring components. Most contractors rent shoring, so always best to check your local market for shoring/formwork rental companies to see what is available.

RE: Whats the best type for temp. shoring

Exactly. When it comes to shoring, the best solution is the one the contractor has in his yard or can rent easily. (And calcs out for the appropriate loads of course!)

----
just call me Lo.

RE: Whats the best type for temp. shoring

(OP)

jayrod12 (Structural,
It will be sitting on 12" concrete slab on grade reinforced #5@ 12 two ways T&B.
Is this a problem?

Ingenuity (Structural),
Thank you so much for your response and comments.
One worry (concern) is people asking me what if the temp. shoring fails? and there are no extra means for preventing the platform from collapse!!!
Doe that mean I have to provide more shoring so if one fails doesn't result the platform collapse? Is it a typical to provide redundant shoring?

Thank you for all your helps
Skj

RE: Whats the best type for temp. shoring

It is quite Atypical to provide redundant shoring.

What/ifs are always around. What if that column you designed gets taken out by a vehicle? Do you always have an alternate load path?

I don't know if I have ever seen a redundant shoring system.

RE: Whats the best type for temp. shoring

(OP)
jayrod12 (Structural),
Thank you for your comment on redundant shoring.

Thank you,
Skj

RE: Whats the best type for temp. shoring

This is a take on jayrod12 comment about vehicle damage. I remember reading about a shoring system failure in Washington DC back alt least 20 years ago when rain water backed up behind the shoring system and collapsed it. I do not remember all the "particulars" but the point I am making is that there could many other potential problems, so traffic and related vibration are not the only problems.
To me I would explore the use of a tower to replace the column and offset its position a few feet inward toward the platform center. Also if you use plywood for shoring use 3/4" marine plywood to be consistent with OSHA excavation regulation.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

eBook - Mastering Tolerances for Machined Parts
When making CNC machined parts, mastering tolerances can be challenging. Are general tolerances good enough? When does it make sense to call out for tighter tolerances? Do you need a better understanding of fits, datums, or GD&T? Learn about these topics and more in Xometry's new e-book. Download Now
eBook – How to Choose the Correct Corrosion Testing Method
When designing a metal component, engineers have to consider how susceptible certain alloys are to corrosion in the final product’s operating environment. In a recent study by NACE (National Association of Corrosion Engineers), it was estimated that the direct and indirect costs of corrosion in the United States is approximately 6.2% of the GDP. In 2016, that cost exceeded $1 trillion dollars for the first time. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close