×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Binder Ignition Oven

Binder Ignition Oven

Binder Ignition Oven

(OP)
My lab recently purchased an NCAT Asphalt Content Furnace by Thermo Scientific.
We had problems with this oven (burnt wires upon start up as some internal wiring was not completed at manufacture/assembly stage)
Replacement oven arrived with an error code suggesting the main board might be faulty.

What sort of luck are other labs are having with NCAT ovens?
Have had good luck with these in the past, so wondering if I just run into bad luck with 2/2 ovens having problems, or if these ovens aren't as well built and reliable as in the past?

Also - any labs using Troxler burn ovens, and specifically their new ICO NCat Oven, and if so - any feedback or opinions on these?
I'm familiar with the Troxler NTO oven, but don't know any labs that are using the ICO ovens yet.

Thanks

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

White Paper – Your Construction ERP RFP Checklist
Selecting business software for a medium to enterprise-sized construction concern is extremely challenging in large part because most enterprise resource planning (ERP) suites originated in the world of repetitive manufacturing and are therefore a poor fit for a project and asset-centric business. However, midsize to large contractors need the predictable, auditable processes that ERP delivers. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close