INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Cold flare

Cold flare

Cold flare

(OP)
Hi
In design of gas compressor stations we consider cold stack (approximately 20 meter hight) for emergency case. But in API 521 Standard insisted we design cold stack with hot flare requirement which it leads us to height of more than 50 meter length with more than 80000 square meter land should be acquired.since gas stations mostly installed or will install in remote island and far away from town is it need to design stack with hot flare requirement? Would you please guide me to judge and trade off between height and land acquisition and how to design this stack ?
Replies continue below

Recommended for you

RE: Cold flare

There isnt any "trade off". If you need a vent, then you must design to code. If you rate says it must be 50m heigh, then it must be 50m high. But usually the height is associated to ensure that thermal radiation is acceptable at ground level. An alternative is to fence off the area beneath the vent and only allow entry when the plant is shut in and depressurized. Then you could allow a higher thermal radiation within the fence and have the max. allowable radiation at the fence.

Best regaards, Morten

RE: Cold flare

It is rather basic, but make absolutely sure you are looking up the right references for this exact installation. A natural gas compressor station on a natural gas transfer point of a pipeline usually does not have a hot flare at all. Vent pipes are far, far shorter on natural gas end-points in a GT power plant, but are installed for cold venting (no flares!) the turbine and NG control piping on emergency shutdown.

API controls the safety and venting and pressure systems inside a refinery or plant. Are you assuming its restrictions and requirements are also controlling the NG piping inside the refinery boundary by default?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close