INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cost to Jack & Bore

Cost to Jack & Bore

Cost to Jack & Bore

(OP)
Hi, folks,
I'm working on a project in Hall County, Georgia, where I may need to tie into a sewer line on the opposite side of a state highway. Does anyone have any approximate per linear foot costs for jacking and boring or directional drilling? That, and any advice you might have on the preferred method, would be greatly appreciated. The distance covered would be approximately 60'.
Thanks!

RE: Cost to Jack & Bore

It depends a lot on the soil conditions and presence of rock/cobbles. You mention sewer - is it a gravity line or force main? Gravity may be more expensive due to the straight grade required - if soil conditions and the methods used even allow for it. Mobilization can also be a big variable depending on how far the contractor has to travel - it looks like Hall Co is fairly rural, so you may not have a qualified contractor nearby.

For one point of reference on cost, we were recently quoted about $50k to bore two 8" casings about 40' long under a railroad for a couple of gravity sewer services in central Washington state. YMMV.

#

RE: Cost to Jack & Bore

looking at Pinward's price it's $625/LF. If I escalate the price I found to 2019 it's about $520/LF for 8" pipe, without the add-ons in the footnote. $625 could be a good starting point. In graduate school I had to take a course in estimating & cost engineering; the professor worked in the piping industry. He said they used this formula for estimating based on economy of scale:

Known cost x ((proposed size/known size)^0.6) = estimated cost

RE: Cost to Jack & Bore

(OP)
Wow, that's discouraging. I had a piping contractor give me a price of $140 per linear foot. He said that's includes everything - mobilization, materials, equipment, and labor (not counting setting 2 manholes). That would work out. But $625 is probably a project killer. I guess I need to do more research.

Thanks for your answers, guys. I appreciate it.

RE: Cost to Jack & Bore

I would be asking for more info from this piping contractor you got the estimate from. Do they do that work? If so, get a quote in writing. If he doesn't do that work, ask him to refer you to whoever he thinks will do it for that price, and see if they really will.

My guess is that his $140/LF estimate would be for a much larger project. As has been alluded to, most of cost of your project will likely be mobilization, so much depends on whether there is someone nearby with the right equipment.



RE: Cost to Jack & Bore

The same professor also said "when someone gives you an estimate, ask him what's in it". BTW, you never mentioned the pipe size or length?

About 30+ years ago, I worked on a project where the electrical sub chose to jack 4" steel conduit below city streets to avoid pavement removal, MPT, etc. The conduits were generally 30 to 50 feet. I don't know what we paid but generally a two man crew could bore one hole a day, then they bang the conduit through with a back hoe. They would dig jacking pits at each end and used a pneumatic machine that looked like a torpedo; it was about 5' long if my memory serves me..

RE: Cost to Jack & Bore

I inspected a job where the sewer contractor augered holes from the mainline sewer trench to the right of way line for installation of 4 inch sewer laterals. they would auger a 10 - 20 foot long hole, install the pipe and move on to the next and a three man crew managed about 10 - 20 houses per day. but the trench was already dug, and they did hit a leach field which I am sure cost extra

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

eBook - Efficient and Effective Production Support with 3D Printed Jigs and Fixtures
Jigs and fixtures offer manufacturers a reliable process for delivering accurate, high-quality outcomes, whether for a specific part or feature, or for consistency across multiples of parts. Although the methodologies and materials for producing jigs and fixtures have evolved beyond the conventional metal tooling of years past, their position as a manufacturing staple remains constant due to the benefits they offer. Download Now
Overcoming Cutting Tool Challenges in Aerospace Machining
Aerospace manufacturing has always been on the cutting edge, from materials to production techniques. However, these two aspects of aerospace machining can conflict, as manufacturers strive to maintain machining efficiency with new materials by using new methods and cutting tools. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close