×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Synchronous moving line ideas ASC file

Synchronous moving line ideas ASC file

Synchronous moving line ideas ASC file

(OP)
Not sure what I am doing wrong. I'm trying to use an older Ideas drawing we have to update in NX 10. I exported the asc drawing file. I imported the drawing into NX 10. I'm trying to use the synchronous move line command. I can't select any of the lines. I checked and it isn't a layer thing. No visible only layers. Move lines only lets me select "work part only" do I have to move the existing lines to work part?? Can't seem to find a good example of this tool.

RE: Synchronous moving line ideas ASC file

Try moving it in the Expand Mode

Ronald van den Broek
Senior Application Engineer
Winterthur Gas & Diesel Ltd
NX9 / TC10.1.2

Building new PLM environment from Scratch using NX12 / TC11

RE: Synchronous moving line ideas ASC file

(OP)
I can move items in expand mode but I'm trying to use the synchronous move like in this example. However my lines are not selectable seems to be they are not part of the work part.
https://www.youtube.com/watch?v=KEPLD4wp-LQ

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

White Paper – Your Construction ERP RFP Checklist
Selecting business software for a medium to enterprise-sized construction concern is extremely challenging in large part because most enterprise resource planning (ERP) suites originated in the world of repetitive manufacturing and are therefore a poor fit for a project and asset-centric business. However, midsize to large contractors need the predictable, auditable processes that ERP delivers. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close