INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Is a Tank QA/QC Manual Required in order to build an API 650 Tank?

Is a Tank QA/QC Manual Required in order to build an API 650 Tank?

Is a Tank QA/QC Manual Required in order to build an API 650 Tank?

(OP)
It seems like a simple straight foreword answer, but I have not found anywhere in API 650 where it states that the fabricator must have a QA/QC Manual for Tanks in order to design and build an API 650 Tank.

We are having an issue with a fabrication company that shop-built and certified an API 650 Tank for us. I asked to see their QA/QC Manual for Tanks and they sent a manual For ASME Pressure Vessels. Is this generally acceptable practice? I've been in the Inspection Industry for 16 years now and I don't recall a Tank shop using a Pressure Vessel QA/QC Manual for API 650 Storage Tanks.

RE: Is a Tank QA/QC Manual Required in order to build an API 650 Tank?

It's not a requirement- the requirements for API tanks are less stringent than those for pressure vessels.

RE: Is a Tank QA/QC Manual Required in order to build an API 650 Tank?

A bit hidden, but section 1.3.1. states

"The Manufacturer is responsible for complying with all provisions of this standard. Inspection by the Purchaser’s inspector does not negate the Manufacturer’s obligation to provide quality control and inspection necessary to ensure such compliance. The Manufacturer shall also communicate specified requirements to relevant subcontractors or suppliers working at the request of the Manufacturer."

Now it's difficult to demonstrate you have provided QC and inspection without a manual.

Also, if you required ANNEX Y in your scope / specification (API monogram) Annex Y requires that

"The use of the Monogram on products constitutes a representation and warranty by the Licensee to purchasers of the products that, on the date indicated, the products were produced in accordance with a verified quality management system and in accordance with an API product specification.

So if they've stamped it "API", ask for the API verified QMS.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: Is a Tank QA/QC Manual Required in order to build an API 650 Tank?

A little bit confused by your post but it may just be terminology from different parts of the world.
Cannot understand what a QA/QC manual is ?
In my part of the world we have a QMS (Quality Management System) or a QMP (Quality Management Plan).
Both detail how the owner of the document is going to ensure that a quality product is provided.
These need to be approved by the client prior to commencement of the project.
Then on completion you have the MDR (Manufacturers Data Record/Report) or MRB (Manufacturers Record Book) which should contain every bit of relevant information pertaining to the finished product.
Regards,
Shane

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close