INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Wall Removal

Wall Removal

Wall Removal

(OP)
Hi,
A client of wants to build on a single storey extension onto the rear of a 2 storey house. He wants to interconnect both rooms which means taking out 50% of the original rear wall of the house at ground floor level on one side of the house. Should I be concerned about lateral stability along this line. Should I put in a steel portal structure in this zone to stiffen up this zone or am I being too conservative?

RE: Wall Removal

Quote (Contraflexure74)

Should I be concerned about lateral stability along this line.

Yes.

Quote (Contraflexure74)

Should I put in a steel portal structure in this zone to stiffen up this zone or am I being too conservative?

Difficult to know without more details and/or your analysis. One thing to be careful with is that, unless it's a very stiff moment frame, the lion's share of the lateral load may end up going to the remaining wall segments whether your put the moment frame in or not. Moment frames struggle to compete with the stiffness of walls.

RE: Wall Removal

At a minimum I'd suspect you're going to need to demo some of the siding prior to the design to verify what you have for existing shear wall construction. You'll also likely be turning one shearwall into one or two smaller shearwalls which may require more nailing or holddowns to be acceptable.

If you're not experienced in wood shearwall design I'd brush up on that as you'll likely have to run the numbers to prove that the new system works. Your new structure will also be adding load onto this wall.

I'd also make sure you'll have a sufficient member to act as a shear collector above the opening to take the lateral load from the second floor and get it into the remaining first floor wall.

Overall it sounds like a fun project that's not too difficult but definitely one you'll want to make sure is feasible before you make any promises.

Ian Riley, PE, SE
Professional Engineer (ME, NH, VT, CT, MA, FL) Structural Engineer (IL)
American Concrete Industries https://americanconcrete.com/

RE: Wall Removal

You don't necessarily have to put in a lateral restraint in the existing location, although it would make everyone's lives easier. You can also try to push the load out to the new exterior wall using a floor diaphragm or something similar. This is going to shift loads around in general though, so you'd have to consider the full effects of things like the eccentricity of the lateral loads on the floor above and the fact that you'll need to deal with diaphragm flange forces in both directions, as well as tying those back into the building.

RE: Wall Removal

I'd suspect you're all set; especially if you're just opening below the window or deleting that corner area. If you're removing an entire wall panel in one of the corners you may have a minor issue but I suspect it works in practice and could be made to work within your engineering codes.

Can you sketch the wall(s) to be removed?

Ian Riley, PE, SE
Professional Engineer (ME, NH, VT, CT, MA, FL) Structural Engineer (IL)
American Concrete Industries https://americanconcrete.com/

RE: Wall Removal

I don't like the idea of a post in the open area, even if at a counter. Can one of the beams be extended to far wall? Loads are light so it should not be a problem with ceiling height.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

eBook - Efficient and Effective Production Support with 3D Printed Jigs and Fixtures
Jigs and fixtures offer manufacturers a reliable process for delivering accurate, high-quality outcomes, whether for a specific part or feature, or for consistency across multiples of parts. Although the methodologies and materials for producing jigs and fixtures have evolved beyond the conventional metal tooling of years past, their position as a manufacturing staple remains constant due to the benefits they offer. Download Now
Overcoming Cutting Tool Challenges in Aerospace Machining
Aerospace manufacturing has always been on the cutting edge, from materials to production techniques. However, these two aspects of aerospace machining can conflict, as manufacturers strive to maintain machining efficiency with new materials by using new methods and cutting tools. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close