INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Coefficient of Consolidation (Cv) Question with Project Background

Coefficient of Consolidation (Cv) Question with Project Background

Coefficient of Consolidation (Cv) Question with Project Background

(OP)
I am attempting to estimate the time rate of primary consolidation for a particular soil profile due to placement of a large area fill load.

We drilled several SPT borings at the site and determined that the subsurface profile generally consists of 10 feet of existing fill (mostly granular, medium dense to dense) over 3 feet of silty fibrous peat over up to 40 feet of Boston Blue Clay (BBC)(CL) to contact with a gravel layer. Based on the SPT data, the BBC ranges in consistency from stiff (top 1/3) to soft/very soft (middle 1/3) to medium stiff (lower 1/3). Out of all the borings, we were only able to walk away with one reliable tube sample (taken in the soft clay), which I submitted for a 1D incremental consolidation test. My Cc and Cr values from the consolidation curve reconstruction agree fairly well with published BBC values and my Cc value is on par with some of the liquid limit correlations. With that said, I have run through some other correlations for the peat and stiffer clay layers to get the information necessary to calculate the total (ultimate) primary consolidation settlement of each layer and all layers combined. I am now stuck at the time-rate portion of this exercise.

The lab results for the consolidation test provide a summary table of values associated with the end of primary consolidation (EOP) for each load increment relative to Log of Time and Square Root of Time space. One of those values is the coefficient of consolidation (Cv) such that there is a Cv value for each load increment (as there should be since Cv is a function of k which changes with e). I understand this is all pretty basic so far, so here is my ultimate question: is there a correct approach to selecting a correct Cv value out of the bunch for use in the time-rate calculation to determine time (t) at 90% consolidation?

I have considered doing the following and seeing what happens:
1. Averaging all the Cv values.
2. Selecting the Cv value associated with the load increment stress nearest to the proposed vertical effective stress.

Once I determine the above, would it be acceptable to apply that Cv value to the entire BBC thickness even though there are definite differences in stress history?

Any input is greatly appreciated!

RE: Coefficient of Consolidation (Cv) Question with Project Background

I'd say Option 2 is the correct approach. However, this implies time-dependency of the cv parameter, so you'll want to find a way to automate the selection; generally you'll find a good trend with applied stress. You might also find the variation of cv makes little difference to the result, in which case Option 1 is okay.

For conventional settlement analyses, the cv parameter just controls when primary consolidation ends/secondary consolidation begins. While you would expect more primary consolidation from softer material, stiffer material may initiate secondary consolidation sooner. Nonetheless, for most applications, I'd expect applying results from a soft layer to the stiffer layer would achieve larger settlement results.

RE: Coefficient of Consolidation (Cv) Question with Project Background

I'd expect the Cv values in recompression will be from a similar family of values. I'd expect the same for the Cv values in virgin compression.

Don't forget to consider secondary compression in the peat! Heck, the Blue Clay too!

f-d

ípapß gordo ainÆt no madre flaca!

RE: Coefficient of Consolidation (Cv) Question with Project Background

(OP)
Thank you both for your replies. I'll begin with using the lowest and highest Cv values reported from the lab data and seeing how much of a difference it makes; if this difference in time rate is negligible, this discussion is probably moot.

fattdad: in regards to secondary compression, the lab-reported C-alpha values for each load increment on the BBC test samples are all zero (reported as 0+e00). Does this make sense to you? In terms of total primary consolidation settlement, I am getting about 8 inches from the peat and less than 1/2 inch from the clay, so comparatively speaking, the clay is not really much of a concern for the proposed fill load. Do you have any good sources on secondary compression of fibrous peats? I'll need to assume some values based on moisture content, organic content, and visual classification.

RE: Coefficient of Consolidation (Cv) Question with Project Background

look at the last slide of this presentation. I don't know the reference for the presentation, the last slide is the Mesri correlation to water content.
.
https://slideplayer.com/slide/10533550/

Your lab reports Csub-alpha as zero because they triggered the next load to immediately apply at the end of primary. I reject those lab certificates and require all consolidation tests to run for at least 4 hrs after the end of primary or until the straight line is defined.

f-d

ípapß gordo ainÆt no madre flaca!

RE: Coefficient of Consolidation (Cv) Question with Project Background

I am not that familiar with boston blue clay but based on the info posted I think your in the range as per the photo below. You should report the range of time by varying the Cv and thickness/drainage path. Taking either the min or max or two standard deviations of variation from mean of all your estimates.

The first stage of site investigation is desktop and it informs the engineer of the anticipated subsurface conditions. By precluding the site investigation the design engineer cannot accept any responsibility for providing a safe and economical design.

RE: Coefficient of Consolidation (Cv) Question with Project Background

(OP)
fattdad - We did one 24-hour load hold in the virgin compression range for the sole purpose of getting a decent C-alpha value, which was still reported as zero. We used Geotesting Express, which seems to be a pretty reliable lab. I have also seen you reference the "expanded layer" technique in some older threads (provided in the NAVFAC manual). I am hesitant to assign a single Cv to the entire clay stratum since my soft clay is sandwiched between two stiffer clay layers and if I treat the middle soft layer as its own layer with its own Cv value, theoretically there would be no vertical drainage and the pore pressures would never dissipate in that layer. This has lead me to the expanded layer method. Do you have any other info/references on that method besides NAVFAC?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

White Paper - Guide to Integrate Large-Format Additive
As with any new technology, getting into large-format 3D printing begins with investigation. The first question may be a simple one: what does “large-format” mean? For 3D printers, “large” is a relative term. Many extrusion-based (FFF) 3D printers are referred to as desktop machines, because they fit on table space. Some of these have very respectable build volumes – but when it comes to “large-format,” the machines will need their own dedicated floor space. Large-format 3D printers have significant build volumes and are most often found in professional settings, like manufacturing facilities and R&D centers. Download Now
eBook - Efficient and Effective Production Support with 3D Printed Jigs and Fixtures
Jigs and fixtures offer manufacturers a reliable process for delivering accurate, high-quality outcomes, whether for a specific part or feature, or for consistency across multiples of parts. Although the methodologies and materials for producing jigs and fixtures have evolved beyond the conventional metal tooling of years past, their position as a manufacturing staple remains constant due to the benefits they offer. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close