INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ESP Calculation
3

ESP Calculation

ESP Calculation

(OP)
Hi there,

Just wanted to ask a simple question but couldnt find a satisfactory answer yet. Actually, while calculating the esp in a duct, we usually take the index route or the critical route. But my question is that shouldnt the esp be the sum of all the routes including the index route cuz the air is being supplied to all the diffuser outlets at once, so why is the index route only considered leaving out the rest?? I understand that index route has the highest pressure drop but arent the other routes also having some pressure drop, the total esp should be = esp (index route) + esp for the other routes. And similarly for the pump head calculations as well. But we only consider the index route, why is it, can anyone please explain it. Thanks

RE: ESP Calculation

You are calculating the pressure drop that the fan or pump must overcome. If it can overcome the pressure drop of the critical route, then it has enough pressure to overcome the other routes. Your routes are in parallel to one another. During the balancing process, you will artificially add pressure drops to the non-critical routes via damper or circuit setters. The individual flows are additive, but not the individual pressure drops.

RE: ESP Calculation

Think of pressure developed by the fan in a similar manner as the voltage provided by a battery..

RE: ESP Calculation

If the pressure were additive, it would be saying that the fan has to have enough power to move the air all the way through one path and then again all the way through a second path, and so on. But really, if you think about just one "molecule" of air, taking a trip through the whole duct system, it just needs the ability to make it from the beginning to the end one single time. Simultaneous (in parallel) to that, all the other "molecules" are also traveling from the beginning to the same or different end, and they all utilize that same single pressure/force created by the fan.

RE: ESP Calculation

If you are driving on a tollway, and you drive the full length, do you pay the toll for going the whole distance down the tollway, or do you pay the toll for every exit on the tollway plus the final toll?

RE: ESP Calculation

good analogy urgross!

RE: ESP Calculation

The pressure drop is from the inlet to the outlet. In the ductwork system the pressure at the end of all air outlet is the same and same with all the inlet. When air is pushed by the fan and if the ductwork runs are not balanced more air will go through the least resistance. The duct paths of least resistance need damper to regulate the air going through. The fan if sized to deliver the design cfm at the index run therefore would be adequate so long as the paths of least resistance are properly dampered to allow their corresponding design air cfm to pass through and kill of the corresponding excess pressure.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

White Paper – Your Construction ERP RFP Checklist
Selecting business software for a medium to enterprise-sized construction concern is extremely challenging in large part because most enterprise resource planning (ERP) suites originated in the world of repetitive manufacturing and are therefore a poor fit for a project and asset-centric business. However, midsize to large contractors need the predictable, auditable processes that ERP delivers. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close