INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

(OP)
I was told at pile penetration resistances over around 10BL/in. you are likely not fully mobilizing and your PDA is likely under predicting your capacity. Can anyone confirm or deny this? Does anyone know of any good sources of research on this topic?

RE: Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

Not sure of the actual answer here but based my experience the PDA is usually conservative with H-piles driven to shale bedrock. I've had people tell me that the PDA is usually conservative in general.

I had a project with HP12s and HP14s driven 120+ feet down to shale. We PDA'd one of each and then performed a static load test.

The final blows for the HP14x89 were 10-8-11-12, PDA capacity at end of driving was around 680 kips, re-strike the next day was 700 kips, and the static load test was 920-1000 kips (based on Davisson's criterion).

The final blows of the HP12x74 were 6-10-9-9, PDA capacity at the end of driving was 585 kips, re-strike the next day was 575 kips, and the static load test was 612-640 kips.

We PDA'd several more piles on the project but didn't load test them. HP12x74 PDA results ranged from 540 to 640 kips. HP14x89 ranged from 675 to 820 kips.

RE: Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

Hi MTNClimber, I am interested to your experience in PDA & static loading test.
Can you inform us some information on the static load tested piles such as: the hammer weight, falling height, final set & rebound value?

RE: Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

JHeisenberg,

Yes certainly for closed-end driven piles, but different value may apply for open-ended driven steel tubular piles due to potential plugging and founding material (soil vs. rock).
References: FHWA-NHI-16-009, NCHRP SYNTHESIS 478, FHWA-AK-RD-12-07

RE: Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

(OP)
That is interesting info MTNClimber, thanks.

I will look into those references HENRYZAU.

RE: Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

L0k,

The hammer was a Junttan HHK-9A hydraulic hammer so there isn't a fall height. The rig provides an estimated energy level for each blow. But in case you were wondering the HHK-9A has a ram weight of 19.84 kips, max stroke of 4 feet, and a max rated energy of 79.36 ft-kips.

The hammer was running around 51 ft-kips for the HP14x89 and 44 ft-kips for the HP12x74 (based on the PDA test results). I've noticed that the estimated energy on the rig doesn't always match the PDA, especially if the pile driving contractor does not input the correct hammer specs into the computer.

For the static load tests, the piles failed around 1.5 to 2-inches of displacement. Pile set was around 0.4". Not sure what rebound is but I'm guessing it's displacement at failure minus pile set?

Also just, an FYI, the final blows were blows/inch.

RE: Rule of Thumb for Mobilizing Full Capacity During PDA Testing?

Thanks, MTNClimber Based on your data I calculated the ultimate pile capacity are 640kips and 740kips for HP12x74 and HP14x89 respectively. I assumed the rebound value 0.6" and the hammer efficiency is 85%

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper – Choosing the Right Spring Loaded Connector
In today’s cost-sensitive world, designers are often driven to specify the lowest cost solution for every aspect of their designs to ensure that their solution is competitively priced and their company remains profitable. However, specifying a low-cost, low-quality connector solution can result in premature failure, considerable re-work costs and damage to reputations. Download Now
eBook – Own the Lifecycle: Sustainable Business Transformation
Increasingly, product and services companies are seeking more information and control in the operational lifecycle of their products, including service and use. Better information about the operational lifecycle, and the ability to use that information, requires more than just unstructured data flowing back from products in the field. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close