×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Percolation pit/trenches close to slopes

Percolation pit/trenches close to slopes

Percolation pit/trenches close to slopes

(OP)
Hi, we have a building site which is in a terrace area surrounded by steep vegetated slopes (~30%). The site soils are sandy silts / silty sands. The site is in an undeveloped area and the city office is "encouraging" us to use infiltration systems to manage rainfall water. We are planning to use permeable pavements, paver block parking lots and percolation pits and trenches. My question is about what are the considerations for placing percolation systems such as percolation pits and trenches close to the top of the slopes. Are any typical recommendations for setback? We need to do a slope stability analysis but just wondering if there are any standard guidelines. Also, I just found a design guideline for San Diego City, CA and it says: "maintain a 15-foot setback from all parts of the disposal trench to daylight on the slope." This may be a good start point.

For example, for building foundations, we do not want to install percolation pits closer than 10-foot from the foundations. This is a standard recommendation.

RE: Percolation pit/trenches close to slopes

In a situation like this I'd want some on-site test studies of just what would be going on for then establishing some standards. Flow nets supplemented by observation wells at a typical test site along with the stability studies would be involved. Lab tests for permeability of "undisturbed" (as close as you can) samples needed. Then you have ammunition for setting standards for the special situation you have..

RE: Percolation pit/trenches close to slopes

(OP)
Hi OG, thanks for the input. Yes, we are doing some field percolation tests and start from there. You are right, we will need to consider seepage in our slope stability analysis...

RE: Percolation pit/trenches close to slopes

I've done this using an impervious clay... also proprietary units like Ecoflow (sp?)

Dik

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - The Criticality of the E/E Architecture
Modern vehicles are highly sophisticated systems incorporating electrical, electronic, software and mechanical components. Mechanical systems are giving way to advanced software and electronic devices, driving automakers to innovate and differentiate their vehicles via the electric and electronic (E/E) architecture. As the pace of change accelerates, automotive companies need to evolve their development processes to deliver and maximize the value of these architectures. Download Now
White Paper - Model Based Engineering for Wire Harness Manufacturing
Modern cars, trucks, and other vehicles feature an ever-increasing number of sophisticated electrical and electronic features, placing a larger burden on the wiring harness that enables these new features. As complexity rises, current harness manufacturing methods are struggling to keep pace due to manual data exchanges and the inability to capture tribal knowledge. A model-based wire harness manufacturing engineering flow automates data exchange and captures tribal knowledge through design rules to help harness manufacturers improve harness quality and boost efficiency. Download Now
White Paper - Modeling and Optimizing Wire Harness Costs for Variation Complexity
This paper will focus on the quantification of the complexity related costs in harness variations in order to model them, allowing automated algorithms to optimize for these costs. A number of real world examples will be provided as well. Since no two businesses are alike, it is the aim of this paper to provide the foundational knowledge and methodology so the reader can assess their own business to model how variation complexity costs affect their business. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close