×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Parking Lot Paving Replacement?

Parking Lot Paving Replacement?

Parking Lot Paving Replacement?

(OP)
I have a parking area for a building located in Ithaca that needs paving work. I have attached picture, I have several, but it seems like only one per post, so I will try to get a few more up. I believe the entire area should be demolished, new subbase and pavement applied, would the experts agree?

RE: Parking Lot Paving Replacement?

The surface asphalt looks pretty bad, but I'd be curious on the aggregate base. The alligatored pavement will likely not be bridged with an overlay and the amount of faulting would lead me to shy away from a geo-mat / petro-mat. Take some cores &/or dig a few holes to verify the depth of aggregate base. If the lot hasn't been overloaded by traffic, the aggregate base has a good chance of still being free of soil migration into the rock. Elsewise you may have less thickness than you need. A full coreout is pretty disruptive and I'd make sure its warranted beforehand. I think taking that extra step with the client will help them understand the scope better and not just having someone shoot from the hip.

RE: Parking Lot Paving Replacement?

'gator cracking is generally indicative of poor material underneath... adding a topping may just provide for new cracking.

Dik

RE: Parking Lot Paving Replacement?

I don't see how the surface can be salvaged. Without some sort of subsurface exploration like eea said, you're just guessing. Maybe the subbase is fine, but the top was too thin. Maybe more trucks parked there than the designer anticipated. Maybe you need to go full depth, with geogrid or separation fabric. Without understanding the cause, your client will probably end up spending more than they need to, either due to premature failure or a thicker section than needed.

My glass has a v/c ratio of 0.5

Maybe the tyranny of Murphy is the penalty for hubris. - http://xkcd.com/319/

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - The Criticality of the E/E Architecture
Modern vehicles are highly sophisticated systems incorporating electrical, electronic, software and mechanical components. Mechanical systems are giving way to advanced software and electronic devices, driving automakers to innovate and differentiate their vehicles via the electric and electronic (E/E) architecture. As the pace of change accelerates, automotive companies need to evolve their development processes to deliver and maximize the value of these architectures. Download Now
White Paper - Model Based Engineering for Wire Harness Manufacturing
Modern cars, trucks, and other vehicles feature an ever-increasing number of sophisticated electrical and electronic features, placing a larger burden on the wiring harness that enables these new features. As complexity rises, current harness manufacturing methods are struggling to keep pace due to manual data exchanges and the inability to capture tribal knowledge. A model-based wire harness manufacturing engineering flow automates data exchange and captures tribal knowledge through design rules to help harness manufacturers improve harness quality and boost efficiency. Download Now
White Paper - Modeling and Optimizing Wire Harness Costs for Variation Complexity
This paper will focus on the quantification of the complexity related costs in harness variations in order to model them, allowing automated algorithms to optimize for these costs. A number of real world examples will be provided as well. Since no two businesses are alike, it is the aim of this paper to provide the foundational knowledge and methodology so the reader can assess their own business to model how variation complexity costs affect their business. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close