Orifice position in plan 22
Orifice position in plan 22
(OP)
We have a pump in which plan 52 + plan 22 is double seal combination is used.
In plan 22, will any of the following orifice position/s cause malfunctioning?
1. Between discharge and seal flush cooler
2. Between cooler and seal flush inlet
3. Two orifices in above-mentioned positions.
In plan 22, will any of the following orifice position/s cause malfunctioning?
1. Between discharge and seal flush cooler
2. Between cooler and seal flush inlet
3. Two orifices in above-mentioned positions.
RE: Orifice position in plan 22
With that said, most literature will discourage the use of plans 21/22 in favor of the plan 23.