INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Estimating Water Use for Dust Control

Estimating Water Use for Dust Control

Estimating Water Use for Dust Control

(OP)
Hi All,

Anyone know where to start looking for estimating water use for dust control? Is there a rule of thumb for the amount of water used per square foot of disturbed area per day?

- Riversidean

RE: Estimating Water Use for Dust Control

We use water trucks for dust control on unpaved waste product haul roads at electric generating stations. Water quantity varies primarily with ambient temperature and humidity. The number of waste product haul truck cycles is of lesser importance. In (hot) summer conditions water must be applied continuously, in (mild) winter conditions, maybe a few times per day. No single answer.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: Estimating Water Use for Dust Control

As SRE said it depends on a number of factors. I worked at a landfill expansion site some years ago; in the summer the water truck was driving the site from starting time to quitting time; less frequent in the spring and fall. Take a look at the link below, it might be of some help.

Link

RE: Estimating Water Use for Dust Control

Water quantity on our job sites were for two purposes; one purpose was to control dust on dirt roads and the amount of water was based on street length, cloud cover, temperature, and relative humidity. The amount of water to be used was as needed but after a few days of hot weather you developed a sense how often you had to go to a hydrant to fill up; a second purpose was to control dust emission (primarily to limit the silica exposure) when cutting into concrete and again the amount was determined by the seat of your pants. The best advice I can offer is the experience that you develop on that job.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - Addressing Tooling and Casting Requirements at the Design Stage
Several of the tooling and casting requirements of a part can be addressed at the design stage. If these requirements are not addressed at the design stage, lot of time is spent in design iteration when the design reaches the die caster. These design issues lead to increase in time and cost of production leading to delay in time to market and reduced profits for the organization. Download Now
White Paper - The Other Side of Design for Assembly
Assembly level constraints need to be satisfied before the design can move downstream. This white paper will go through the various assembly level issues, which need to be tackled by various organizations on a regular basis. Know more about DFMPro, a design for assembly software. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close