INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

tc and rainfall duration specified - pond size calculation

tc and rainfall duration specified - pond size calculation

tc and rainfall duration specified - pond size calculation

(OP)
Hi,

I'm a bit of a newbie on calculating detention ponds etc.
Our regulatory agency requires the following:
- Use of a one in 5-year design storm for the allowable pre-development run-off rate
- Use of a one in 25-year design storm for the post-development run-off rate
- Size of outlet control control that is equal or less than predevelopment velocities
- Use a min. 3hr rainfall duration event and a minimum 1hr time of concentration

The agency prefers use of the rational method. The questions is if we have a relatively small area to be developed into residential lots of 1 acre.
Pre-development tc = 40min / C = 0.15 and post development tc = 25min / C = 0.35.
How can I calculate the pond storage using a tc of 1hr and a 3hr rainfall event by using the rational method, which as far as I have read up assumes that the storm duration equals the time of concentration?
Any suggestions or comments would be appreciated.

RE: tc and rainfall duration specified - pond size calculation

With modified rational method the rainfall duration is independent of the Tc. This allows you to develop a trapezoidal runoff hydrograph with a Tc of 1 hour and a rainfall duration of 3 hours. Frankly, I don't recommend the use of Rational method for pond sizing, but if you must that's how the hydrograph is developed.

For details and a sample hydrograph please see www.hydrocad.net/rational.htm

Peter Smart
HydroCAD Software
www.hydrocad.net

RE: tc and rainfall duration specified - pond size calculation

(OP)
Thank you.
What method do you recommend for Pond Sizing?

RE: tc and rainfall duration specified - pond size calculation

Any accepted hydrograph method, SCS/NRCS, Clark, & etc... I would say it depends on your regulating authority.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close