INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Related Articles

Jobs

Repair Boiler Field Assembly. Is it R stamp is apply??

Repair Boiler Field Assembly. Is it R stamp is apply??

Repair Boiler Field Assembly. Is it R stamp is apply??

(OP)
Background

leaking was found on tube (Supplied By Part Manufacture) during we fill in the water prior to HT on Field. So Eng.Contractor(That Responsible on design) decide to repair the things, assist by the part Manufacture/fabricator of water wall tube. Form P4 was completed sign off by AI. But Form P3(Master Data Report) not yet sign off by assembly AI due to HT still outstanding.

Question

1) Is it Require to apply the R stamp on that paticular items? Even item's was repair by manufacture it self by using their WPS and qualified welders?

2) Is it AI from manufacture or AI from the Eng.Contrator have to reviewed and accepted the method of statement or repair procedure?


Thanks In advance for opinions and advices.

RE: Repair Boiler Field Assembly. Is it R stamp is apply??

It would appear with the boiler not being completed and hydrostatically tested during field assembly, nonconformances or repairs are done by the ASME S stamp holder.

Typically, an R-Stamp is not permitted by the NBIC or ASME B&PV Code during construction, which includes field assembly. Once the boiler is completed, hydrostatically tested and stamped, the NBIC R-stamp can be used for repairs.

RE: Repair Boiler Field Assembly. Is it R stamp is apply??

(OP)
Ok understand and thank you sir.

AliQ

RE: Repair Boiler Field Assembly. Is it R stamp is apply??

Agree with Metengr
There is a good old interpretation I-98-35 from ASME about this situation.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

Research Report: State of IoT Adoption in Product Development 2019
This research report, based on a survey of 234 product development professionals, examines the current state of Internet of Things (IoT) adoption by product design teams, its perceived importance, and what features and capabilities teams consider important when making decision about adding IoT functionality to their products. Download Now
Research Report: Augmented Reality for Maintenance, Repair and Overhaul (MRO)
The term Industry 4.0 denotes a cluster of technologies that’s poised to fundamentally reshape manufacturing and bring about a new industrial revolution. These include 3D printing (AM), the Industrial Internet of Things (IIoT), artificial intelligence (AI) and mixed reality technologies, more commonly known as virtual reality (VR) and augmented reality (AR). Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close