×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Soldier Pile in Rock - Shear Resistance Check!

Soldier Pile in Rock - Shear Resistance Check!

Soldier Pile in Rock - Shear Resistance Check!

(OP)
I have a project with permanent soldier H-beam wall with lagging. It is embedded into the bedrock below excavation via an oversized cored hole, filled with lean concrete (2.5 ksi). I have modelled this in L-Pile and have checked the bending resistance and the shear resistance. Bending is fine but the Shear diagram shows a massive increase into the rock portion which is 10x the active forces. The maximum moment occurs just before the rock. WHY DOES THE HIGH SHEAR OCCUR IN THE ROCK? Is this really what the shear diagram looks like? My H-Pile section fails when checked for shear resistance tolerance. I have been told that the reason for the massive increase in shear is due to the dissipation of the moment. I have been spinning my wheels on this concept for 2 days now. I figure this condition is just like a cantilever steel beam analysis with one end fixed.

RE: Soldier Pile in Rock - Shear Resistance Check!

L-Pile does not analyze the soldier beams like a steel beam embedded in totally rigid material. L-Pile assumes that the shear and moment increase and then dissipate into the embedment material as a function of the stiffness of the embedment material. AISC's Table 3-23, Diagrams 18 and 19 assume that the embedment material is so stiff that the moment and shear are maximum and terminated at the face on the embedment material.

www.PeirceEngineering.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close