INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

ASTM - Operational Hours & Sampling Testing ?

ASTM - Operational Hours & Sampling Testing ?

ASTM - Operational Hours & Sampling Testing ?

(OP)
Does an ASTM standard exist, across any industry, for a duration before components need to be NDTed?

For instance, if I have a machine that has a maintenance schedule which requires magnetic particle testing (MT) of a specific area once yearly, I am trying to find out if there are any existing standards that can be applied to said machine which would have say 10% of machined components sampled and 5% of welded components sampled and MT or PT tested after say 18,000 operational hours or 10 operational years. This would be on top of the regular annual maintenance.

If no such standards exist, does anyone know of a similar standard for any industry which I may reference? It can reference operational hours, years, cycles, etc.

Many thanks.

RE: ASTM - Operational Hours & Sampling Testing ?

Are you talking about predictive maintenance?
There systems out there that you can use for determining schedules, provided that you have enough data.
In general you are stuck with the manufacturers recommendations, and whatever extensions you see as being prudent.
Is this a machine function issue or is it safety driven? If we are talking about lifting equipment then there is an entire field of work on that.
I know of m any machines that are operated for decades without any NDT whatsoever. It puzzles me why you would have equipment (unless for lifting) that requires testing.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: ASTM - Operational Hours & Sampling Testing ?

(OP)
Appreciate the response Ed.

Yes I am talking about predictive maintenance.

Yes it is safety driven.

Specifically, I'm researching this for amusement park rides. There are many ASTM standards for rides, but none with regards to predictive maintenance. This is why I am asking for other industry standards in hope of adopting them.

If there are predictive maintenance standards for lifting equipment, can you point me in the correct direction to research?

If there are any other standards regarding aging equipment, I am all ears (or eyes in this case).

RE: ASTM - Operational Hours & Sampling Testing ?

Building amusement park rides versus operating and maintaing are world's apart. Some Jurisdictions in the US have specific inspection requirements for amusement park rides or carnival rides prior to service.

Beyond this, I would defer to the manufacturer who designed and built the ride. They would know best minimum inspection and design criteria. From this, one could develop operating history and inspect critical components on a selected time basis. I would also check with machinery insurers to determine if they have any guidelines for specific inspections and intervals.

RE: ASTM - Operational Hours & Sampling Testing ?

(OP)
This inquiry is with regards to operating and maintaining machines/rides, not building. You are correct each state has their own requirements and inspections for amusement park and carnival rides. However, each state uses the ASTMs as a guide for their own requirements.

I work for the manufacture, hence this inquiry. We (several manufactures) are seeking to set an industry standard for a NDT inspection beyond ~18,000 operational hours or 10 operational years. This has been long talked about in the industry but thus far un-implemented. We would like to have a standard/ASTM to, at the very least, reference going forwards.

The amusement park industry cannot be the first industry to want to create a standard regarding operation of a machine beyond a specified lifespan, can we? And to be clear, we are not saying rides only last 10 years. We have many rides from the 80s and earlier that successfully and safely operate daily. We want to set a precedent for additional checks on older rides.

The manufacture's manuals cover everything asked by the current ASTMs for amusement park rides and more. However, an industry standard set forth via an ASTM would go a long way.

Thank you for the replies and we appreciate the help/guidance anyone can provide.

RE: ASTM - Operational Hours & Sampling Testing ?

I would shy away from ASTM and contact ASME Codes and Standards. They might be able to provide input in establishing a document that can be used as a standard for amusement ride inspections.

RE: ASTM - Operational Hours & Sampling Testing ?

Why not look into the rules for overhead lifting equipment (cranes, hoists, and rigging).
They might have things that are closer to what you have in mind.
ASTM is a good venue for this since it is a consensus based organization, but I don't think that you will find existing standards helpful.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: ASTM - Operational Hours & Sampling Testing ?

Quote:

ASTM is a good venue for this since it is a consensus based organization,

And ASME Codes and Standards is not????? Below lifting hook standards are provided by ASME not ASTM.

https://www.asme.org/products/codes-standards/belo...

RE: ASTM - Operational Hours & Sampling Testing ?

(OP)
Thank you for the suggestions.

I have found a wonderful case study regarding cranes' life expectancy by HAAG Engineering.

I'm going to raise (pun intended?) some of the points made for cranes with the ride industry. I expect a rebuttal.

For anyone else interested, here is the link.

RE: ASTM - Operational Hours & Sampling Testing ?

Met, you are correct, but I was thinking of some of the industry guidelines that are not Code.
I couldn't remember the name of the SC&RA.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close