INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

CJP weld to column web

CJP weld to column web

CJP weld to column web

(OP)
Hi,

Just out of curiosity, have anyone seen a beam stub CJP welded to column web? The column web is 1 1/2'' thick. Is it possible to CJP weld the beam to column web with this thickness? Beam flange and web thickness is 1 3/4''. Will the weld rip off the column web?

I just want to understand if CJP shop weld is possible between these two?

Thanks

RE: CJP weld to column web

The closest thing I know of is in "Design of Welded Structures" by Omer W. Blodgett where it shows a procedure for checking the face of a built-up box/tube column with a beam fully welded to the face of the tube. It should be the same thing for a web. It is a yield-line type of approach for the beam flange force effects on the column face.

RE: CJP weld to column web

BAGW:
Those are really heavy W12, 14 or W18 sections in the +250 lbs./ft. range. My biggest issue would be that you likely don’t have enough room to get into the joint to make proper CJP welds. Between working inside the column flanges, and reaching into the joint 5, 6, 7" around the column flange tips, and then also working around a beam section which barely fits btwn. the column flanges or the column flg/web radius’ (the ‘k’ area). The beam web weld would be very difficult too.

RE: CJP weld to column web

That sounds like an unusual connection. Aside from whether or not the weld can be installed, where does the flange force go after it gets into the web? Do you have a similar connection on the other side of the web? (If so, there's the load path.) But if you don't have a similar connection on the other side of the web, then the web will not be strong enough to resist the axial loads from the flanges. Can you turn the column 90 degrees and weld your stub to the flange? If it's a "beam stub" why is the moment so high? Is there column posting up on the end of the stub? Do you need a CJP weld? Why not fillet welds?

RE: CJP weld to column web

We have done a similar connection. We used full depth web stiffeners in the column section that were thicker than the beam flange (trimmed to miss the "k"". These were fillet welded to the column web and flanges. We also added a vertical plate between the two stiffeners, that mimicked the beam web (to allow for bolted shear plates). We then CJP'd the beam flange to the stiffeners. We had beams on each side of the column. We had a short cantilever to deal with, so our members were much smaller.

I would not suggest the CJP to the column web.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - Reshoring Prototyping and Production
In this whitepaper, we'll provide insight into why and when it makes sense for U.S. manufacturers to reshore prototyping and production, and how companies can leverage the benefits of working with local design, prototype, and manufacturing partners during the pandemic and beyond. Download Now
Engineering Report - Top 10 Defect Types in Production
This 22-page report from Instrumental identifies the most common production defect types discovered in 2020, showcases trends from 2019 to 2020, and provides insights on how to prevent potential downtime in 2021. Unlike other methods, Instrumental drives correlations between a variety of data sources to help engineers find and fix root causes. Download Now
White Paper - Addressing Tooling and Casting Requirements at the Design Stage
Several of the tooling and casting requirements of a part can be addressed at the design stage. If these requirements are not addressed at the design stage, lot of time is spent in design iteration when the design reaches the die caster. These design issues lead to increase in time and cost of production leading to delay in time to market and reduced profits for the organization. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close