INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Speed up heavy lifting jack operation

Speed up heavy lifting jack operation

Speed up heavy lifting jack operation

(OP)
Hi,

I need help choosing a system, or enhance one that would be capable to accelare and de-accelerate a 5ton steel mass over 400mm in 10seconds....right now the existing system uses a lifting jack, motor and gearbox, and takes about 90seconds to complete the full operation...I am looking for suggestions and where to start to look at...new equipment...similar solutions...

BTW we are also trying to reduce the load to lift...But I am trying to stick to the worst scenario....

thanks guys

Luis
Replies continue below

Recommended for you

RE: Speed up heavy lifting jack operation

what is wrong with your current setup? What do you want to achieve which is different to what you are doing now?

You need to give a bit more information on what you want e.g. do you want to lift quicker?

RE: Speed up heavy lifting jack operation

Hydraulics or a counterweight are applicable. You need to work out the particular acceleration profile you want to see what maximum force is required.

RE: Speed up heavy lifting jack operation

Luis,

I would calculate how much capacity the current system, including lifting jack, motor, gearbox and structural linkajes, pivots, etc., has to resist forces nine times greater.

Because the system may only be able to handle a a portion of the additional load, you may need to re-inforce the jack structure or add one, as well as add a new lifting jack, motor, gearbox and electrical circuit.

"Where the spirit does not work with the hand, there is no art." - Leonardo da Vinci

RE: Speed up heavy lifting jack operation

Start by calculating the current system and very that what you get is what the calculations show. Then it will fairly easy to choose the correct components to achieve the 10 sec goal. You may be fined that it is not possible with electrical system if you have space restrictions and/or current limitations. You need to be able to write the dynamic equations describing the motor, gear, inertias including the transient behavior of the motor. All that before adding the control system.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close