INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Relief Valve Fire Sizing ASME Sec VIII, Div. 1

Relief Valve Fire Sizing ASME Sec VIII, Div. 1

Relief Valve Fire Sizing ASME Sec VIII, Div. 1

(OP)
In evaluating the pressure relieving requirements for a pressure vessel in the fire sizing case (UG-133(b)), the pressure is allowed to 21% above the vessel MAWP.  There is no mention of vessel temperature, although Appendix M-14(a) suggests it should be considered.  

If a high boiling point liquid is in the vessel, the case may arrise where the design temperature is exceeded well before the MAWP is reached.  In this case, which of the following is correct?

1.) The vessel must stay below the design temperature and below 121% of the MAWP when relieving.
 
2.) The vessel must stay below 121% of the MAWP, and temperature is not considered.

3.) The vessel MAWP is derated for temperature, and the pressure must stay below 121% of the derated MAWP at the elevated temperature?

RE: Relief Valve Fire Sizing ASME Sec VIII, Div. 1

Probably number 3, with a variation.

It might depend on the length of time that the vessel was exposed to temperature above design temperature.  If there has been damage to the vessel due to exposure to external fire, it might be best to evaluate the condition of the vessel using API RP 579, Fitness For Service.  Based on that evaluation, a vessel rerate may be required that would lower the MAWP since a loss of strength could occur, which you referenced in your question.  If then it does get rerated at a lower MAWP, then I would guess that relieving pressure rise would be able to go to 121% of MAWP.

My guess is that UG-133(b) doesn't mention temperature since the fire may either be put out before damaging the metal to a point of failure or the vessel is emptied before that point.  However, pressure rise can occur much quicker and as such, the need to protect failure due to overpressurization is needed and addressed in the Code.

RE: Relief Valve Fire Sizing ASME Sec VIII, Div. 1

I would definately derate the MAWP of the tank in your PSV calculations to correspond to the pressure at which the liquid boils at the design temp. of the tank. Use 21% above that pressure.

RE: Relief Valve Fire Sizing ASME Sec VIII, Div. 1

Allowable stresses in the ASME Code for carbon steel at elevated temperatures (above 700 or 800 degrees F) are based on the Creep to Rupture Criteria (100,000 hrs.). Creep is the result of long term exposure to elevated temperatures and would not necessarily be applicable for the fire case.
If you were to attempt to determine the MAWP at the fire case temperature, you would need to determine an allowable stress based on tensile strength or yield strength of the material at that temperature. Appendix P of ASME Section VIII, Div. 1 gives the "Basis for Establishing Allowable Stress Values".

RE: Relief Valve Fire Sizing ASME Sec VIII, Div. 1

(OP)
Option #3 was used, and the de-rating was done using allowable stresses at the elevated temperature from ASME Sec IID.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper – Choosing the Right Spring Loaded Connector
In today’s cost-sensitive world, designers are often driven to specify the lowest cost solution for every aspect of their designs to ensure that their solution is competitively priced and their company remains profitable. However, specifying a low-cost, low-quality connector solution can result in premature failure, considerable re-work costs and damage to reputations. Download Now
eBook – Own the Lifecycle: Sustainable Business Transformation
Increasingly, product and services companies are seeking more information and control in the operational lifecycle of their products, including service and use. Better information about the operational lifecycle, and the ability to use that information, requires more than just unstructured data flowing back from products in the field. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close