×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Demonstrating MTBF with a small sample size

Demonstrating MTBF with a small sample size

Demonstrating MTBF with a small sample size

(OP)
Hello,
To preface I have never done any reliability engineering before so, this is written from the point of view of someone who knows nearly nothing about the subject. Sorry
A customer has specified targets/requirements for the life of and MTBF (mean time between failure?) of an engine system we are developing.  I am trying to figure out what kind of a test program we need to plan on to demonstrate that we have met this requirement and hopefully claim we have exceeded these objectives.   Lets say 100 hrs life and 3000 hours mtbf.  We know from our previous development( using an agreed upon duty cycle) that the system is capable of operating for much longer than the required life before the units starts to have wear out related failures,  250 hrs.   
The cost driver for testing the system is the price of the units themselves, running them is relatively cheap.  We usually end up with a small sample size ≈3 and running them for long durations.  There is a time constraint on the program so even test time is limited.
Traditionally on our other products we run time terminated test programs with aggressive duty cycles running the units beyond their normal life but stopping short of failures from just wearing out.  
Back to MTBF, to demonstrate a 90% confidence of 3000 hours  assuming an exponential failure distribution (might be ok if the engines service life is short of wearing out and systems  are "burned in" prior to being put into the field?) it would take 7000 hours of testing without failure.  With a small # of units we would end up having to run the systems for very long durations running the risk of wear out failures.  Is there some way around this?
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close