INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Las Vegas Tower Issues

Las Vegas Tower Issues

Las Vegas Tower Issues

(OP)
All-

Could someone direct me to a link that explains the history / design defects known about this tower? I have always followed it from afar, but I would be interested in knowing more about it.

http://www.lvrj.com/business/county-faulted-on-harmon-128659628.html

Thanks,
MJB

"We shape our buildings, thereafter they shape us." -WSC

Replies continue below

Recommended for you

RE: Las Vegas Tower Issues

I don't know the facts - but have heard rumors of uneven settlement, poor joints, cracks, etc.

I am sure that will all come out in the lawsuit....

RE: Las Vegas Tower Issues

From what I have read so far, something smells very bad here. It sounds like for economic reasons MGM would rather wipe this building off the strip then deal with it anymore. Las Vegas is way overbuilt, and this seems to be MGM's white elephant. If a brand new building can be fixed, and the owner is pushing for demo, that just strikes me as very odd.

But on a technical side of things, I would have to read more about it...

RE: Las Vegas Tower Issues

That article posted by Teguci makes things clear as mud. Seems like all three firms, two of which I recognize as well-respected in our industry, don't even agree on some basics like the design was ok, but construction was bad, or vice-versa.

You'd think if it was originally designed for 48 stories and now its only 28 stories that the reduction in mass and thus seismic loading would make most of the modifications/repairs a lot simpler. This will be an interesting one to follow, hope the truth or some semblance comes out of the whole thing.

RE: Las Vegas Tower Issues

Well of course you have a problem Walter P Moore, you removed all the concrete from the column! :)

What I did not like is that it seemed like all three companies, and maybe I misread that, offered to take over as EOR and do the repairs?

I hate to say this, but a neutral 4th party who will not be doing anything other than evaluating the 3 reports needs to be brought in. I never fully trust the opinion of someone who has a horse in the race.

RE: Las Vegas Tower Issues

Don't worry a2mfk, the lawyers will sort out all the problems and come to a clean easy to understand reason for the problems with the help of expert engineering testimony.  

Maybe the drawings were in metric and the contractor was using imperial (klingon)?

RE: Las Vegas Tower Issues

I think that they started building this monstrosity, then put the condos up for sale right when the market crashed. Meanwhile, the contractor is pouring concrete like gangbusters. So the owner needed a way to bail, preferably without losing his/her shirt. So they magnified some design and construction errors, had some experts say the building is a danger, and they have a case to get out without paying for the construction.
I've read that the building is not salvageable. But I know that seismic retrofits have been done in buildings that don't meet code all the time. I can't comprehend that for a lot less money than starting over, even if there are errors, the building couldn't be made safe.  

RE: Las Vegas Tower Issues

There have been third (fourth?) party engineering evaluations.  There are apparently defects which make retrofit very expensive, and when you lose half of your lease space, a project quickly loses economy.

I do not have special information about this project, but have done a bit of repair work, and retrofit can easily surpass the cost of original construction.  Imagine removing every bit of cover on every column, one at a time, custom fitting new ties, then forming and pumping special mix around each column, increasing column dimensions in the process.  And still not gaining any additional lease space.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close