INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Design Loads for Concrete Liners in Shafts

Design Loads for Concrete Liners in Shafts

Design Loads for Concrete Liners in Shafts

(OP)
Hello,

I'm looking for references on design loads for concrete liners in deep shafts.  We are doing preliminary design for an 800 foot deep shaft. Site sub-surface exploration has not been completed yet.  We are considering using a concrete liner as the permanent lining.  I'm interested in determining the external pressures so that I can design the lining.  I've checked USACE EM 1110-2-2901 and a few textbooks, but haven't found any real good direction yet.

Could anybody point me to a good reference?

Thanks!

RE: Design Loads for Concrete Liners in Shafts

800 feet is not deep ,  it is in fact quite shallow.  Cant give you  references for design manuals but you'll almost certainly end up with a concrete thickness of  2-3 feet.

Major practical  issues are is this soft rock or hard rock   country?? Expected water inflow rates??   Grouting required   yes or no ???   Is this a mine or civil engineering project.  Expect totally different standards  

RE: Design Loads for Concrete Liners in Shafts

(OP)
Thanks miningman,

This is a civil engineering project in the NE United States.  We haven't started our sub-surface exploration yet, so I don't have detailed geotech info for you.  I can say that we expect the shaft to be located in a shale formation and that grouting will be required.

Our preliminary estimates of the shaft lining thickness are on the low end of the range you suggest, but it really depends on the assumptions you make regarding ground water pressures.  This is why I was looking for some design references, I wanted to get a sense for some reasonable design criteria.  As the shaft OD, and thus project footprint and cost, will be directly tied to the lining thickness, we really want to nail this down as early on in the process as possible.

Thanks again.

RE: Design Loads for Concrete Liners in Shafts

  OK, now I'm curious.  Is the shaft to be excavated with drill and blast techniques or  some form of raise boring??  What is the presently planned inside finished diameter??

Regardless, in shale I would expect semi significant overbreak ( possibly extensive if using D+B) and the fact that you anticipate grouting means there'll be close to 350 psi hydrostatic pressure at the bottom of the shaft.

The local in situ stresses may help calculate overbreak but I would doubt the accuracy of any such calculations.... in my opinion 800 feet is too shallow for these calculations to provided usefull data

RE: Design Loads for Concrete Liners in Shafts

(OP)
Shaft will be D&B.  Finished ID is 28 ft.

The potential for 350 psi at the bottom of the shaft is exactly what I am concerned about.  If full hydrostatic is actually acting on the concrete lining, then we will need to almost double the thickness of the lining we are carrying through preliminary design.

RE: Design Loads for Concrete Liners in Shafts

  Well  for what its worth, I'm a kinda practical, hands on, field type of engineer rather than a by the book, theoretical guy and I certainly couldn't do the required calculations but I'll predict that from what you've posted, you'll end up with at least 3 feet of concrete thickness , and you WILL have 320 psi at the bottom of the shaft. 28 feet is a bit larger than anything Ive sunk so it may end up being 4 feet and the overbreak will  provide something like 25-33%  increase in actual concrte volume.

This is starting to be a big hole!!!!!!!!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close