×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Building above underground feeder lateral

Building above underground feeder lateral

Building above underground feeder lateral

(OP)

Hi All,

Does the NEC permit erecting a pole barn-type steel building on top of an underground concrete encased duct bank that is approx. 4-5 ft. below grade? An 8" slab concrete parking lot covers the entire area. The duct bank does not contain any service laterals; only feeder laterals, control conduits, and fiber optic conduits that we control and maintain. The building foundation piers are (supposedly) sited to miss the underground duct bank. The location is Houston, TX. Any advice is appreciated.

Thanks!

RE: Building above underground feeder lateral

It would not be an NEC violation.  But that won't help when a cable fails under the building.  

The NEC is primarily concerned about fire hazards and safety.  It does not really address good or bad design practices.  I'm sure you realize that accessing a failed cable under the building would be messy.

David Castor
www.cvoes.com

RE: Building above underground feeder lateral

(OP)

Thank you, dpc. I couldn't find anywhere in the NEC that prohibited a building on top of an underground duct bank, hence the posting of my question. As for accessing a cable underneath a building, you're preaching to the choir my friend. It certainly isn't my preference to have the building over top of the cables, but in fairness to the operations personnel they really don't have any other options. Hopefully we won't have to find out just how messy that could be!

Again, thanks!

RE: Building above underground feeder lateral

Have a look at Article 300.5 in 2008 NEC for more info.   

David Castor
www.cvoes.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close