INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

type 3 semi-rigid moment connections

type 3 semi-rigid moment connections

type 3 semi-rigid moment connections

(OP)
regarding type 3 semi rigid moment connections
(aisc asd pg 4-100)--
designed to rotate under gravity loads but resist wind
moments--as a practical matter, (3 story bldg: 475 ft long
by 175 ft wide) how critical is the unwelded length
of 1.5x flange width
for the top flange plate for the successful performance
of this type of connection?

RE: type 3 semi-rigid moment connections

The size/dimensions of the structure are imaterial.  What is important is the ability of the plates to elongate, thus permitting rotation of the joint (the amount of rotation of course is a function of the length of the beam).  That said, how critical is the unwelded length of the plate?  Probably not critical to the fraction of an inch, but it would be better to be longer (more unwelded length)than shorter.  The closer the weld is to the column, the more rigid the joint will be.

HTH, Scott

RE: type 3 semi-rigid moment connections

(OP)
I gave the bldg size to point out the structure is inherently stable-not a leaning tower of pisa.
My problem is a bldg which is essentially finished and not enough length was provided for the semi rigid mom conn
flange plates to elongate,properly --4" instead of 8".
We are talking about a couple of w16x26 roof beams
spanning 30ft with 30k-ft wind moments. If the semi rigid
mom conn worked perfectly the wind drift would be 1.5". If
the structure was analized assuming pinned conn where the semi rigid joints currently are the wind drift would be 1.75".
Does it make sense to go back into a finished bldg ( mech
ducts,elect conduit,wall board etc)and correct these welds?
What is going to happen if left as is?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close