pavement design
pavement design
(OP)
Hello there,
Please some one give me the full context of the flexible pavement design process?
Please some one give me the full context of the flexible pavement design process?
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting Guidelines |
|
Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.
Here's Why Members Love Eng-Tips Forums:
Register now while it's still free!
Already a member? Close this window and log in.
RE: pavement design
Determine the amount of traffic and its distribution by weight (equivalent single axle loads (ESAL))
Determine the structural number (SN) required for that number of ESALs over the design period (usually 10 to 20 years)
Mix and match combinations of structural layers (asphalt, graded aggregate base, stabilization, subgrade) to satisfy the relationship of:
SN=a1D1+a2D2m+a3D3m...anDnm
where, a=structural layer coefficient for each material
D=layer thickness
m=moisture effect of a particular layer
There are numerous texts that outline this procedure and provide the tables for the various values, as well as a nomograph to assist the design. The most significant reference for the AASHTO method is the AASHTO Design Manual for Pavement Structures.
RE: pavement design
RE: pavement design