INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Assigning multiple resources to a task

Assigning multiple resources to a task

Assigning multiple resources to a task

(OP)

Lets say I have a task that has two different people working on the task with each person having a different hourly rate.  For instance lets say that for Task A John worked 8 hours at a certain rate, and Frank worked 8 hours at another rate.  How do I account for both the individuals at different rates working a a task for a given day?

RE: Assigning multiple resources to a task

Why is that a problem?  If you entered their rates as different numbers, and you entered the total work hours, the total cost sums up correctly.

TTFN

FAQ731-376: Eng-Tips.com Forum Policies

RE: Assigning multiple resources to a task

(OP)
Thanks IRstuff

But what if I am in the Resource usage view and I have a particular task I want to assign multiple resources too.

For example, what if one of the tasks I have is to install pipe.  If both person A and person B installed this pipe, how do I assign both of these persons time to this task?  Do I do this in the resource view, or some other view?

Thanks for the help.

 

RE: Assigning multiple resources to a task

(OP)
If you double click on the task and add the resources directly it only lets you input a certain % of the time worked on the entire task.

I want to track the actual hours that each resource spends on each task on a daily basis throughout the duration of the task.

 

RE: Assigning multiple resources to a task

So, what's preventing you from inputting the hours directly in the Task Usage view after you've entered the resources?

TTFN

FAQ731-376: Eng-Tips.com Forum Policies

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close