INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Fittings for connecting DI and HDPE pipe?

Fittings for connecting DI and HDPE pipe?

Fittings for connecting DI and HDPE pipe?

(OP)
I'm designing a 30" HDPE pipe force main which will be connected to an existing 30" Ductile Iron pipe force main.
The question is what kind of fittings are necessary? Will there be any special requirement because we have two different types of pipes here. Thanks very much for your time and any input.
Replies continue below

Recommended for you

RE: Fittings for connecting DI and HDPE pipe?

Viking Johnson, amongst others,  make pipe couplings suitable for your requirements. Probably better off in the piping forum with this.

Cheers.

RE: Fittings for connecting DI and HDPE pipe?

YOU CAN GET AN HDPE FLANGE FROM YOUR PIPE SUPPLIER. THIS CAN BE WELDED TO THE PIPE WHEN IT IS IN PLACE. THE FLANGE WILL FIT ALL DI FLANGES. JUST USE A MECHANICAL TO FLANGED COUPLING. DON'T FORGET TO WELD AAT LEAST TWO TIE-BACK RODS TO THE HDPE TO ATTACH TO THE DI FLANGE.

RE: Fittings for connecting DI and HDPE pipe?

Sorry for the late reply, new member here.  A few more comments regarding connecting HDPE to DI (or PVC, etc).

Joint restraints, in-line anchors, or a combination of both may be required when non-PE pipe and components are connected to a piping system that does not have restrained joints.  

Due to the Poisson Effect, when internal pressure is applied to the HDPE pipe, it will expand slightly in the radial direction and contract away from the connection.  

Therefore, it is necessary to have a fully restrained connection between the HDPE and DI pipe such as a flange or MJ Adapter (allows you to tie directly to the DI).  Since the force exerted by the HPDE due to the Poisson Effect can be significant, one restrained connection may not be enough.  ie...The second DI joint may pull apart.

Therefore it will be necessary to either install a thrust anchor on the HDPE pipe to take out the thrust.  Or restrain several joints of the DI down stream to avoid the potential pull out.

HDPE pipe manufactures discuss this phenomena in their engineering manuals.  check out www.performancepipe.com      ;

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close