INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Q: Requirements for PWHT personnel qualifications

Q: Requirements for PWHT personnel qualifications

Q: Requirements for PWHT personnel qualifications

(OP)
I've been searching the Codes for an answer to this. I have a requirement in my PWHT procedure (developed by my predecessor) for documentation of PWHT personnel qualifications.  I have not been able to find this requirement in the Codes. Am I just overlooking it? If so, can someone kindly point me to the specific code requirement? Many thanks!

RE: Q: Requirements for PWHT personnel qualifications

Sounds more like a quality assurance requirement. I.E. ISO 9000, API Q1, etc. which will state something to the effect that personnel performing tasks which can affect quality must be qualified to perform that task.

RE: Q: Requirements for PWHT personnel qualifications

(OP)
Yes, training & qualified personnel is covered in the ISO 9001 standard (element 18 of the 1994 version & section 6.2 of the 2000 version). My company is not ISO registered & has no current plans to get registered. I am not familiar with API Q1. API 1104, yes. API Q1, no.

Let me clarify a bit more. We outsource PWHT operations. I have a requirement for qualification paperwork for NDE/NDT personnel - this is understandable & traceable to the code as well as to my clients' turnover package requirements. My predecessor also included this requirement for PWHT personnel in our PWHT procedure.

For example in B31.3 (1999), there are requirements in section VI referring to ASME's BPV code section V & in 342.1 requiring certified records of personnel qualifications for NDE/NDT training/qualification (referring to ASNT SNT-TC-1A). In section V of this same standard, under 331 (HT), there are no requirements for personnel qualifications that I've been able to find.

Specifically, is there a code-based requirement for my company to require records of my subcontractors' personnel training in PWHT processes? I hope my question is better framed this time.

Thanks!

RE: Q: Requirements for PWHT personnel qualifications

I'm guessing, but this might be the catch. There is no requirement to meet the code unless specified by the legal jurisdiction you are in. That same jurisdiction likely also specifies you have some form of quality system in place. So even though qualification of PWHT personnel & PWHT equipment is not specified by the code it may still be a legal requirement in your jurisdiction. At any rate from a litigous standpoint not a bad idea.

RE: Q: Requirements for PWHT personnel qualifications

If there isn't a code that addresses qualification of heat treatment personell, to what standard would they be qualfied.  Who would grant the qualification?  Usually, where a requirement for personell qualification is called out, the qualification requirements are spelled out.  Is there a governing body who qualifies these people?  We do quite a bit of heat treatment where I work so if any one knows, I would be interested in your answer also.

GRoberts

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close