INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

ASTM C 90 CMU testing procedures

ASTM C 90 CMU testing procedures

ASTM C 90 CMU testing procedures

(OP)
I am the QA on a hospital addition in Afghanistan and I have a contractor who is trying to make his own concrete block on site.  I was curious if anyone knew a website that I could view the ASTM specs.  I'm only finding sites that I have to pay for the info.  I'm just needing to know the number of blocks that are allowed in a "batch" for testing.  Any help in this matter would be greatly appreciated.

RE: ASTM C 90 CMU testing procedures

The appropriate products specification is ASTM C90. The testing proceedure is ASTM C140.

You can essentially get the main portions of the specification/procedures free by going to ncma.org (National Concrete Masonry Association) site. Go to the TEK notes portion and select a state (any state) and a producer (any producer). Then, you can search by topic or use the index.

ASTM C140 requires SIX samples, THREE for weight, density, dimensions, area, % solids, absorption, etc. and THREE for compressive strengths. Units for compression testing CANNOT have been used for the weight, density, dimesnsions, etc.

The compressive samples should have a sampling date and testing as soon as possible to eliminate false curing that may change the compressive strength because there is no required time for curing as there is forconcrete lab testing.

The specification applies to the properties "when delivered" to the site. Because of this you will have to determine a method to control the timing between "casting" and use.

In factory production, units usually meet the C90 requirements when they come out of the plant, but a construction site produced CMU will not have the same aggregate controls, batching, material handling and curing.

Despite the low standards set by ASTM C90, it will be a real challege for site produced units to meet the C90 specs unless the materials are very good and there is some relaxation on the dimension requirements.

Is this inspection in association with "Global"?

RE: ASTM C 90 CMU testing procedures

(OP)
Thank you concretemasonry for the help. I'll check out that NCMA web site.

RE: ASTM C 90 CMU testing procedures

I have a couple of freinds practicing architecture in Rangoon, they are working as local architects for a number of embassy projects that are designed by firms in the UK and Australia.  They have first world specifications and a third world construction site.  Local contractors are doing the work and the locally supplied material is not documented or tested at all per the job specification.

I'm wondering how you've negotiated some of these issues if you've had similar expiernce.

Thanks
JR

RE: ASTM C 90 CMU testing procedures

rollcamatic -

The problem could easily be avoided if the out-of-country designers and the local architects discovered what materials are readily available locally since they should know they are designing a structure in london or sydney. - I guess that take more professional ability than using boilerplate from thousands of miles away.

It is always embarassing to a professional and the owner has to pay for excessive shipping and project delays.

Dick

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close