INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Resource Usage Reporting by Summary

Resource Usage Reporting by Summary

Resource Usage Reporting by Summary

(OP)
I see an old question about this with no replies.  Does anyone have any way to report on Resources by project rather than by task?

RE: Resource Usage Reporting by Summary

Not sure exactly what you are looking for, but try this:
-Click on >View, >Resource Sheet
-Click on >Window, >Split
-Click anywhere in the bottom pane, the click on >View, >Resource Graph
-Now by clicking on the various resource names in the top pane, you will get to see their allocation in graphical format in the bottom pane.

Tweaking the view:
1. You may want to change the timephased view in the graph.  I prefer to examine resource allocations at a month period.  To change the time period:
-Click anywhere in the bottom pane
-Click on the Zoom Out magnifying glass (may be a hidden toolbar icons)
2. This graph by default comes in displying Peak Units.  I prefer to examine Work.  To see the Work graph;
-Right click in the timephased area of the bottom graph and click on Work
-I also like to show the availability line in this graph.
-Right click in the timephased portion again
-Click on Bar Styles
-Check the Show Availability Line

Hope this helps!

J Black
www.pmconnection.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close