Modeling CB designed to overflow
Modeling CB designed to overflow
(OP)
Currently working of a model with an existing catch basin with an 8" outlet. I am trying to get the volume of water that will flow off site if the catch basin over flows. Currently modeling the CB as a pond with a primary outlet for the pipe and a secondary outlet as the grate at the top. The grate is set in the horizontal plan at the rim elevation. The flood elevation is also set to the rim elevation. Is this the correct way to model this?
Thanks,
Thanks,
RE: Modeling CB designed to overflow
Make sure it is Secondary discharge, or the overflow will go to the device specified, or keep adding to the final outflow if Primary discharge is specified.
Remember: The Chinese ideogram for “crisis” is comprised of the characters for “danger” and “opportunity.”
-Steve
RE: Modeling CB designed to overflow
If the control point is above the rim, you may also want to define the additional above-grade storage (as part of the CB/Pond) since it can have a significant effect on the hydrograph routing.
For further details please see www.hydrocad.net/pipes.htm