×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Modeling CB designed to overflow

Modeling CB designed to overflow

Modeling CB designed to overflow

(OP)
Currently working of a model with an existing catch basin with an 8" outlet.  I am trying to get the volume of water that will flow off site if the catch basin over flows.  Currently modeling the CB as a pond with a primary outlet for the pipe and a secondary outlet as the grate at the top.  The grate is set in the horizontal plan at the rim elevation. The flood elevation is also set to the rim elevation. Is this the correct way to model this?

Thanks,

RE: Modeling CB designed to overflow

Since the overflow will provide low head pushing out, I would remove the orifice flow constraint by modeling a broad crested weir with a length = to the higher of the frame's inside perimeter, or teh perimeter of the area at the grade break, if the inlet is sumped.  The breadth would be the width of that frame or grade break.

Make sure it is Secondary discharge, or the overflow will go to the device specified, or keep adding to the final outflow if Primary discharge is specified.

Remember: The Chinese ideogram for “crisis” is comprised of the characters for “danger” and “opportunity.”
-Steve

RE: Modeling CB designed to overflow

The key is to determine what will control the overflow.  As LHA suggests, the CB overflow is often modeled as a weir.  In some cases this may be at the rim of the CB, but in other cases it may be a higher low-point in the surrounding pavement.

If the control point is above the rim, you may also want to define the additional above-grade storage (as part of the CB/Pond) since it can have a significant effect on the hydrograph routing.

For further details please see www.hydrocad.net/pipes.htm

  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close