I'm confused by your two posts.
If you are routing the areas together, and the Tc is not the same, the combined peak flow will NOT be a simple addition of the two peaks. It will be the maximum of adding together the flow rates AT EACH TIME INCREMENT.
If the areas are flowing to different locations, I can't understand why one would be adding them up at all. In my locale, one cannot exceed pre flow rates at each runoff location. Not total site. That would be dangerous.
For example, pre Area A had a 1 cfs rate, and Area B had a 99 cfs pre rate...and post Area A had a 90 cfs rate and Area B had 8 cfs...one would be complying with a reduced overall rate, but very likely causing problems at A (1 cfs -> 90 cfs).
If you still only need the simple total of peaks...just write them down...add them up and submit them.