INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Trimmer bars at re-entrant corners of slabs

Trimmer bars at re-entrant corners of slabs

Trimmer bars at re-entrant corners of slabs

(OP)
The Australian code, and I guess most others, requires additional reinforcement at re-entrant corners, openings, etc to control cracks starting from the corners. We usually use trimmer bars at 45 degrees across the corner.
Does anyone have a rational method to determine the quantity and orientation of this reinforcement?

RE: Trimmer bars at re-entrant corners of slabs

For the openings that may be assigned some definite loadings one should be able to use both the strut and tie method and the elastic analyisis to determine stresses, and from there required rebar.

The elastic analyisis is at hand for plates, and then from the stresses we can reinforce, for almost any situation. Maybe some bigger safety factor should be used there.

The more stringent cases, such a cut at the end of the beam to make space for support have some specific procedures stated in the books, but normally I think don't include such bigger safety factor...except in using quite limited tensile stress (and strain) for the rebar.

RE: Trimmer bars at re-entrant corners of slabs

(OP)
I was thinking of the case where stresses are caused by shrinkage. In one form or another the problem of reinforcing for shrinkage cracking at re-entrent corners occurs in almost every concrete slab or wall.

Chris Rohde
Editor, Structural D-zine
http://www.topica.com/lists/Structuraldzine

RE: Trimmer bars at re-entrant corners of slabs

I have seen the kind of analysis you refer to in one Concrete International magazine of 2-3 years ago. Have it entrants or not seems not relevant to what that procedure can give, I assume. In any case it looks the rationale of examining if the restrained shrinkage stresses exceed the available tensile strain seems the way to go. The problem I think is that 3D modeling the early concrete and the early tensile strenght on half hardened concrete is not precisely established ground. In reality not even a proper simple 3D criterium of 3D final strength of normal concrete (what would be the equivalent to some Tresca or Von mises for ductile) seems to have gained the general favour, less for non early concrete. Stress concentrations also may make more difficult to model.

RE: Trimmer bars at re-entrant corners of slabs

Chris,
The rationale is for shrinkage control and I look at it in the same manner as direct tension control, though the actual stress distibution is mostly bi-directional.

As an example, consider a block-out box for a column.  A majority of shrinkage is perpendicular to each "flat" side of the box.  This results in a concentration of shearing occurring at the same time in two different directions, resolving to a 45 degree line off the re-entrant corner.

The result of this bi-directional loading is a bar that is in bending and shear simulaneously, with no good means of predicting the level of stress!

For no good rhyme or reason, when I consider reinforcing across the re-entrant corner, I consider the thickness of the slab (related to mass shrinkage) and use 1 bar perpendicular to the 45 degree line, 3 to 4 inches off corner, assuming a development length of 12 inches on each side of the anticipated crack.  Bar is located upper part of thickness, near center.

For thicker slabs, increase to two bars, parallel, spaced about 12 inches apart.  

You will not completely stop the cracks, but keep them tight.

RE: Trimmer bars at re-entrant corners of slabs

Institution of Structural Engineers' design manual has a prescription as well:
1. Area of rebars interrupted by openings in slabs ahould be replaced by an equivalent amount half of which should be placed along each edge of the opening. Diagonals bars are thus calculated accordingly.
2. For openings in shear/core walls the rebars that are to be provided diagonally should be able to resist a tensile force equal to twice the shear force in the vertical components of the wall. This should not be less than two 16mm dia. bars across each corner of the opening. {T = 2Q; As = T/(0.87fy)}. In addition to this, vertical and horizontal trimmer bars should also be applied. This can be calculated as in 1.

RE: Trimmer bars at re-entrant corners of slabs

Institution of Structural Engineers' design manual (British)has a prescription as well:
1. Area of rebars interrupted by openings in slabs ahould be replaced by an equivalent amount half of which should be placed along each edge of the opening. Diagonals bars are thus calculated accordingly.
2. For openings in shear/core walls the rebars that are to be provided diagonally should be able to resist a tensile force equal to twice the shear force in the vertical components of the wall. This should not be less than two 16mm dia. bars across each corner of the opening. {T = 2Q; As = T/(0.87fy)}. In addition to this, vertical and horizontal trimmer bars should also be applied. This can be calculated as in 1.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

White Paper – Your Construction ERP RFP Checklist
Selecting business software for a medium to enterprise-sized construction concern is extremely challenging in large part because most enterprise resource planning (ERP) suites originated in the world of repetitive manufacturing and are therefore a poor fit for a project and asset-centric business. However, midsize to large contractors need the predictable, auditable processes that ERP delivers. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close