INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

grading specifications

grading specifications

grading specifications

(OP)
Would one of you experts out there give me the low down on the  various compaction requirements such as aashto t99/t180 (the maximum density and optimum moisture test) and the inplace density and moisture test AASHTO T-310.  I guess my question is if I instruct the contractor to compact the granular base to 95% of maximum dry density per aashto T-180, is it the same as specifying 95% of maximum density per AASHTO T-310 (the inplace density and moisture test)?

an example specification (is this conflicting and or redundant?):


1. IMMEDIATELY FOLLOWING FINE GRADING OPERATIONS PROOF  ROLL SUBGRADE OF NEW PAVED AREAS TO ACHIEVE AT LEAST 95% OF THE MAXIMUM DENSITY FOR A 12" DEPTH PER AASHTO T-310.  MOISTURE CONTENT AT THE TIME OF COMPACTING THE MATERIALS SHALL BE PREPARED TO WITHIN MINUS 4% TO PLUS 2% OF OPTIMUM MOISTURE CONTENT PER AASHTO T-180.  EMBANKMENTS OR  FILLS ARE TO BE CONSTRUCTED IN 6" MAXIMUM LIFTS, WITH EACH  LIFT BEING COMPACTED TO 95% OF MAXIMUM DENSITY PRIOR TO PROCEEDING WITH THE NEXT LIFT.  AREAS RECEIVING STRUCTURAL  FILL ARE TO BE TESTED BY A QUALIFIED TESTING LAB.

Thanks in advance.
brb

RE: grading specifications

No.  Specify to achieve 98% of the maximum dry density per AASHTO T-180.  You can then specify a method of density testing if you want, but that's not necessary.  The in-place density test (AASHTO 310) is just a method of determining the in-place density, not its comparison to the laboratory standard test (AASHTO T-180).  Don't confuse the two.  They are different.

Your spec is not the clearest, but is adequate; however, I would phrase it this way...

"Immediately following fine grading operations, proof-roll the subgrade of proposed pavement areas with at least 6 overlapping passes of a vibratory compactor having a static, at-drum weight of at least 10 tons.  Soft or yielding areas shown during proof-rolling shall be over-excavated and replaced with select fill material.

Compaction shall be checked by performing in-place density tests in each 12-inch or less lift, at the rate of one test per 500 square yards of pavement area.  In-place density tests shall be done using AASHTO T310 and shall achieve at least 98 percent of the maximum dry density as determined by AASHTO T180.  All testing shall be done by a commercial testing laboratory meeting the requirements of ASTM E329."



Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now